3
. Installing the Equipment
EzRay Air W (Model: VEX-S300W) Installation Manual
25
EN
G
LISH
3.2.3 Leveling the Power Box Assembly: Front/Rear
1. Place the spirit level on the position as shown in the figure.
2. To adjust the horizontality (level), loosen one wrench bolt by using the wrench.
3. Adjust the headless wrench bolt until the bubble on the spirit level is placed in the
middle.
Allen wrench
5 mm
Since the Power Box Assembly is shipped with one bolt tightened, they
are required to be loosened prior to leveling it.
Содержание EzRay Air W
Страница 1: ......
Страница 2: ......
Страница 3: ......
Страница 4: ......
Страница 10: ...Table of Contents x EzRay Air W VEX S300W Installation Manual This page intentionally left blank...
Страница 12: ...1 Introduction 2 EzRay Air W Model VEX S300W Installation Manual This page intentionally left blank...
Страница 54: ...4 Product Specifications 44 EzRay Air W Model VEX S300W Installation Manual...
Страница 60: ...4 Product Specifications 50 EzRay Air W Model VEX S300W Installation Manual This page intentionally left blank...
Страница 61: ...Appendix EzRay Air W Model VEX S300W Installation Manual 51 ENGLISH Appendix Drilling Template...
Страница 64: ...Appendix 54 EzRay Air W Model VEX S300W Installation Manual This page intentionally left blank...
Страница 66: ......
Страница 67: ......
Страница 68: ......