Transformer Ration Analysis Software Manual
17
A directory window will appear with a list of files to be selected. Select the files to be copied. Click the
“OK” button of the directory window and the file will be copied to the folder to which the program is
pointing and the directory window will be closed.
Figure 13. a Test Plan From a Directory Menu 2
Содержание ATRT-03
Страница 28: ...Transformer Ration Analysis Software Manual 28 Figure 23 Create a Transformer Test Plan Menu 6 ...
Страница 31: ...Transformer Ration Analysis Software Manual 31 Figure 25 Create a Test Plan for a Load Tap Changer Menu 2 ...
Страница 40: ...Transformer Ration Analysis Software Manual 40 Figure 33 Run a Transformer Test Using a Test Plan Step 6 ...
Страница 46: ...Transformer Ration Analysis Software Manual 46 Figure 39 Typical Test Record Printout ...