General Inspection and Preventative Maintenance for Ceiling Lift & Track products
Below is a non-inclusive list of services
Vancare
will provide during their visit(s):
Visual Inspection 1x yearly (Ceiling Lift & Track products):
- The lift lifting tape shows no signs of fraying or breaking along its entire length.
- The stitching on the lift lifting tape where it connects to the carry bar shows no signs of fraying, or
breaking.
- The sling (s) that will be used shows no signs of unusual wear and tear. The straps of the sling that connect
to the
hanger
bar of the lift show no signs of fraying or breaking. Refer to specific sling instructions.
- The airline tube that connects the hand control to the lift is not kinked, twisted, knotted, cut or damaged.
- All the functions on the hand control work correctly (e.g. UP/DOWN/LEFT/RIGHT, etc.)
- The brackets that hold the track in place on the ceiling are secure and do not move or appear loose.
- There are no cuts, dents or sharp edges on the carry bar that may damage the straps of the sling.
- Ensure the lift makes no unusual sounds when the carry bar is moved UP/DOWN or the lift is moved
LEFT/RIGHT.
- Ensure that there are end stops installed at each end of the track.
- Ensure the lift moves freely along the entire length of the track.
- Certify and record of lift inspection for inspector records
Preventative Maintenance 1x yearly (Ceiling Lift & Track products):
- Complete all steps outlined above under Visual Inspection
- Record then reset the PM lifts counter
- Inspect complete lift operation
-Inspect all power connections and record all power volts
- Check and load test Batteries
- Lubricate moving parts as needed
- Clean all rails and trolleys within rails
- Check strap limit switches
- Certify and record of lift inspection for inspector records
Load Testing to EN10535 standards 1x yearly (Ceiling Lift & Track products):
- Tracks will be load tested to 1.25 times the safe working load; each track attachment will be point load
tested. The deflection of the track will be measured and determined if it is acceptable to (EN10535)
standards. - Lifts will be load tested per manufactures specifications
- Inspect above ceiling attachments
- Certify and record of lift inspection for inspector records
C-450/C-625 Technical Manual
031417
Page 48
Содержание C450
Страница 11: ...C 450 C 625 Technical Manual 031417 Page 11 ...
Страница 36: ...C 450 C 625 Technical Manual 031417 Page 36 ...
Страница 38: ...C 450 C 625 Technical Manual 031417 Page 38 ...
Страница 39: ...C 450 C 625 Technical Manual 031417 Page 39 ...
Страница 40: ...l C 450 C 62 Technical C 450 C 625 Technical Manual 031417 Page 40 ...
Страница 41: ...C 450 C 625 Technical Manual 031417 Page 41 ...
Страница 42: ...C 450 C 625 Technical Manual 031417 Page 42 ...
Страница 43: ...C 450 C 625 Technical Manual 031417 Page 43 ...
Страница 44: ...C 450 C 625 Technical Manual 031417 Page 44 ...
Страница 45: ...C 450 C 625 Technical Manual 031417 Page 45 ...
Страница 46: ...17 C 450 C 625 Technical Manual 031417 Page 46 ...
Страница 47: ...C 450 C 625 Technical Manual 031417 Page 47 ...