3. When you drive on public roads and there is an implement on the front
linkage covering the headlights, switch the upper headlights on (optional
equipment).
3.16
Valtra front loader
3.16.1
Valtra front loader
WARNING: Check that all screws are tightened before using the front
loader.
WARNING: Always look at the implement. Objects can fall or roll
backwards onto the driver when the loader is raised. Only lift loads
which can be contained in, and are intended for, the specific
implement.
WARNING: The risk of overturn increases as the loader is raised. Be
extra careful on slopes when operating the loader. Always carry the
loader as low as practical for the conditions.
NOTE: Install the Valtra front loader according to the instructions in the Valtra
loader Operator's Manual. If you want to install any other front loader, contact
your local technical support.
IMPORTANT: When using the front loader, the front linkage lifting links must be
folded to the transport position.
3. Operation
- 200 -
Содержание T144
Страница 1: ...OPERATOR SMANUAL TSERIES HiTech Ref no 39 892 21 3 08 2015 YOUR WORKING MACHINE...
Страница 2: ......
Страница 347: ...1 GUID 83BB3EC4 E4C8 4AB1 988E 6963318C0579 1 Relay K21 Location of relays K31 K33 and K40 4 Maintenance 345...
Страница 378: ...5 7 Towing the tractor 5 7 1 Towing the tractor when the engine is running 5 Troubleshooting 376...
Страница 413: ......