background image

4001533-04

V

ENTANA

WARNING

This conversion kit shall be installed by a 
qualifi ed service agency in accordance with 
the manufacturer’s instructions and all appli-
cable codes and requirements of the authority 
having jurisdiction. If the information in these 
instructions is not followed exactly, a fi re, ex-
plosion or production of carbon monoxide may 
result causing property damage, personal in-
jury or loss of life. The qualifi ed service agency 
is responsible for the proper installation of this 
kit. The installation is not proper and complete 
until the operation of the converted appliance 
is checked as specifi ed in the manufacturer’s 
instructions supplied with the kit.

Use this manual in conjunction with the instal-
lation manual supplied with the appliance.

Gas Conversion Kit

1200PCK/NCK

Installation Instructions

This appliance is certifi ed for use from 0–4500 feet. For 
altitudes above 4500 feet, see local codes.

Kit Contents

1 Main burner
1 Pilot injector—see chart for identifi cation
1 Main burner elbow injector—see chart for 

identifi cation

1 Minimum rate by-pass screw—see chart for 

identifi cation

1 Set of conversion labels
1 Ceramic middle log (NG 4001370; LPG 4001534)

Tools Required

• 

Wrenches, to disconnect gas line

• 

Phillips (+) screwdriver, to remove burner module

• 

Small (jewelers size) fl at blade screwdriver, to set 
pressure

• 

Small fl at blade screwdriver, to release pressure tap 
on valve

• 

Nut driver 8 mm or 5/16”, to remove burner nuts

• 

Needle nose pliers, to remove by-pass screw

• 

Hex (Allen) wrench, 4 mm or 5/32”, to remove pilot 
injector

• 

Manometer, to set pressure when regulator is integral 
with valve

Use with with 

Valor Models 1200 Heater ONLY

Model

 

1200NG

1200LPG

Gas

Natural

Propane

Altitude (Ft.)*

0-4,500 feet*

Input Maximum (Btu/h)

36,000

31,000

Input Minimum (Btu/h)

15,000

15,000

Manifold Pressure (in w.c.)

3.6

10.5

Minimum Supply Pressure (in w.c.)

5.0

11.0

Maximum Supply Pressure (in w.c.)

11.0

14.0

Main Burner Injector Marking

82-1200

92-360

Pilot Injector Marking

62

30

Min. Rate By-Pass Screw

190

125

Specifi cations

© Copyright Miles Industries Ltd., 2014.

Содержание VENTANA 1200NCK

Страница 1: ...ents 1 Main burner 1 Pilot injector see chart for identification 1 Main burner elbow injector see chart for identification 1 Minimum rate by pass screw see chart for identification 1 Set of conversion...

Страница 2: ...or not Whether the burner mounting is considered an earlier model or later model Whether the heater has a separate convertible regulator or a regulator integral to the valve The burner module assembl...

Страница 3: ...e burner tray 5 Replace the main burner by the appropriate fuel burner fixing it back to the burner tray with the two nuts Later models The burner is fixed to the burner tray through two supports The...

Страница 4: ...pulling on it 2 Unscrew the pilot injector using an Allen key Discard the pilot injector 3 Replace with the appropriate pilot injector see Specifications table on page 1 Screw the new injector 4 Refi...

Страница 5: ...crewing 2 Insert the replacement minimum rate by pass screw and hand tighten using a screwdriver Refer to the Specifications table on page 1 for proper by pass screw Note that the number is stamped on...

Страница 6: ...Control valve with integral regulator Early Models with separate regulator Shut off valve supplied with fireplace Flex pipe supplied with fireplace Separate convertible regulator No regulator in contr...

Страница 7: ...ersion label with specs over the corresponding specs on the data label attached to the fireplace at left hand side 2 Install the label small stating the conversion of the appliance on the inside of th...

Страница 8: ...e tel qu indiqu par les directives du fabricant fournies avec ce kit Utilisez ce guide en conjonction avec le guide d installation fourni avec le foyer Kit de conversion de gaz 1200PCK NCK Directives...

Страница 9: ...lon la version initiale ou selon le plus r cent mod le Le foyer est quipp d un r gulateur s par ou int gr la soupape Il n est pas n cessaire d enlever le module du br leur dans le cas suivant La conve...

Страница 10: ...laque 5 Remplacez le br leur par le br leur appropri selon le gaz et fixez le avec les deux crous enlev s pr c demment Production plus r cente Le br leur est mont la plaque l aide de supports qui sont...

Страница 11: ...la veilleuse l aide d une cl hexagonale Allen Jetez l injecteur 3 Remplacez avec un injecteur appropri pour le type de gaz utilis voir le tableau Indices signal tiques la page 1 Vissez le nouvel inje...

Страница 12: ...nt l aide d un tournevis Consultez le tableau Indices signal tiques la page 1 savoir quelle est la vis appropri e au type de gaz Notez que le num ro indiqu est grav sur la tige de la vis R installatio...

Страница 13: ...r int gr Production initiale avec r gulateur s par Robinet d arr t fourni avec le foyer Conduit flexible fourni avec le foyer R gulateur convertible s par Soupape sans r gulateur NG LPG 1 Enlevez le c...

Страница 14: ...e conversion 1 Collez l tiquette de conversion contenant les indices signal tiques sur les indices de l tiquette d j coll e l int rieur de la paroi ext rieure gauche de la bo te de foyer derri re la s...

Отзывы: