
Power Switch
8-24
LigaSure Vessel Sealing Generator Service Manual
Install a New Power Switch
1.
Position the power switch in the panel opening so that the on position (|) is
above the off position (
O
).
2.
Push the switch into the opening until the switch snaps into place.
3.
Reconnect the wires to the power switch by pushing the terminals onto the
pins. Connect the bottom pins, AC switch 1, first.
4.
Attach the front panel:
a.
Position the panel:
The lip on the bottom of the chassis fits into the groove on the bottom of
the front panel.
Tabs on the front panel upper corners fit outside the corresponding chassis
mounting tabs.
b.
Replace the four screws that secure the front panel to the chassis:
Two screws, with washers – one each on the left and right upper corners
formed at the front and sides of the unit.
Two screws on the underside of the front panel, one under each handset
receptacle.
5.
Reconnect three cables:
6.
Install the cover. For further information, refer to
Cover
in this chapter.
7.
Connect the power cord to the wall receptacle.
Name
Location
Pin
No. Wires
Color
From
AC
switch 1
Bottom of
switch module
1A
2A
1
1
brown
blue
HV power
supply board
AC
switch 2
Top of switch
module
1
2
1
1
brown
blue
Input power
module
Name
Ref
Location
Wires
Colors
RF out cables
(2)
J10 &
J11 on
RF
board
Near front edge of
RF board
4 (per
cable)
brown, blue,
yellow, and white
Control board
ribbon cable
Control board
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com