
Footswitch Board
8-14
LigaSure Vessel Sealing Generator Service Manual
Figure 8-7.
The position of the footswitch
board on the rear wall of the
chassis
3.
Replace the screws and washers (M3 x .5 x 8) that secure the board to the
chassis:
a.
Install the inside screw and washer first.
b.
Position the footswitch mounting bracket: Hold the bracket in place with a
finger in the gap between the board and the rear wall of the unit.
c.
Install the lower left and upper right screws and washers first, then the
remaining two screws and washers.
4.
Connect the footswitch ribbon cable to the RF board and the footswitch board.
5.
Install the control board. For further information, refer to
Install the Control
Board
in this chapter.
6.
Install the cover. For further information, refer to
Cover
in this chapter.
7.
Connect the power cord to the wall receptacle.
Footswitch Board
Low Voltage Power
Supply Board
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com