Task
Checked OK/Not
OK
Remarks
Klystron Systems
IF COHO is connected to J13
ADC–E
of RVP901.
Tx license key is installed (circle one):
• Yes
• No
Test Passed
For Customer
Date:
For Vaisala
Date:
A.4 Power Up Check
Test Goal
Verify that RVP901 and RVP902 properly power up.
To run the test, apply power to RVP902 (or reset it) and RVP901.
Checklist
Table 89 Power Up Checklist
Task
Checked
OK/Not OK
Remarks
When power is applied to RVP901:
• Red and green lights (D7) may blink on boot and then green light is solid
• The red light is solid if software is running on server and blink if software is
not running.
When the CAT5E cable is disconnected from either RVP902 server or RVP901:
• Green light (D7) remains on.
• Red light blinks indicating it has lost connection to the software.
Test Passed
For Customer
Date:
For Vaisala
Date:
RVP900 User Guide
M211322EN-J
342
Содержание RVP900
Страница 1: ...M211322EN J User Guide RVP900 Digital Receiver and Signal Processor RVP900...
Страница 19: ...RVP9IFD China RoHS Compliance RVP901 AC and RCP903 China RoHS Compliance Chapter 2 Product Overview 17...
Страница 22: ...RVP900 User Guide M211322EN J 20...
Страница 88: ...RVP900 User Guide M211322EN J 86...
Страница 170: ...RVP900 User Guide M211322EN J 168...
Страница 236: ...RVP900 User Guide M211322EN J 234...
Страница 390: ...RVP900 User Guide M211322EN J 388...
Страница 434: ...Figure 68 ASR9 WSP with RVP7 Architecture RVP900 User Guide M211322EN J 432...
Страница 456: ...Figure 82 J90 to J111 Wiring Diagrams RVP900 User Guide M211322EN J 454...
Страница 457: ...Figure 83 J13 Wiring Diagram Appendix H TDWR Customizations 455...
Страница 468: ...RVP900 User Guide M211322EN J 466...
Страница 482: ...RVP900 User Guide M211322EN J 480...
Страница 483: ......
Страница 484: ...www vaisala com...