6. Adding devices to CAB100B
6.1 Adding PDT101 transmitters as new
modules to CAB100B
• Empty DIN rail in the cabinet
• PDT Wiring Set, 1 set per 4 PDT101 transmitters. The set contains the following:
• Cable set for PDT or safety
• Data logger data cable
• Data logger holder
• DL4000 data logger(s), 1 logger per 4 PDT101 transmitters
• Small flat head screwdriver
For item codes, see
Spare parts and accessories (page 119)
You can install only one type of device or measurement point (PDT101 transmitters, analog
input channels, safety barriers, or galvanic isolators) per row in the cabinet.
In cabinet models with 5 to 8 data loggers, you need 2 serial port servers.
One serial port server controls the traffic of maximum 4 data loggers.
Make sure to number the data loggers as well as the cable sets and wires in the PDT
Wiring Set before you install and connect them.
Follow the steps below to install PDT101 transmitters as new devices to an empty DIN rail in
CAB100B. Refer to
CAB100B layout diagrams (page 135)
when planning the installation.
For instructions on expanding the number of PDT101 transmitters installed in the cabinet,
see
Expanding PDT101 transmitter installation in CAB100B (page 48)
CAB100 Installation Guide
M212242EN-B
42
Содержание CAB100
Страница 1: ...M212242EN B Installation Guide CMS Industrial Cabinet CAB100...
Страница 144: ......
Страница 146: ...www vaisala com...