2
Installation and maintenance instructions 0020213394_05
Installation and maintenance
instructions
Contents
Safety .................................................................... 4
Intended use .......................................................... 4
General safety information .................................... 4
Regulations (directives, laws, standards) .............. 6
Notes on the documentation .............................. 7
Observing other applicable documents ................. 7
Storing documents................................................. 7
Validity of the instructions...................................... 7
System overview.................................................. 7
Heat pump system design ..................................... 7
Functionality........................................................... 8
Safety devices ....................................................... 9
Product description........................................... 10
Product design..................................................... 10
Information on the data plate............................... 11
Explanation of product stickers............................ 11
Type designation and serial number ................... 12
CE marking .......................................................... 12
Benchmark........................................................... 12
Set-up.................................................................. 12
Checking the scope of delivery............................ 12
Selecting the installation site ............................... 12
Dimensions .......................................................... 13
Minimum clearances............................................ 14
Transporting the heat pump ................................ 14
Installing the product............................................ 15
Removing the carrying straps.............................. 15
Removing the front casing................................... 15
Removing the casing top and side casings ......... 16
Carrying out the hydraulics installation.......... 17
Requirements for the heating circuit.................... 17
Connecting the heat pump to the brine circuit ..... 17
Hydraulic wiring in the system ............................. 18
Filling and purging the installation .................. 18
Filling and purging the heating circuit .................. 18
Filling and purging the brine circuit...................... 19
Electrical installation......................................... 21
Routing eBUS lines.............................................. 21
Opening the electronics box ............................... 21
Electronics box .................................................... 22
Establishing the power supply ............................. 22
Power supply PCB............................................... 24
Control PCB......................................................... 25
Connection terminals........................................... 26
Connecting the system control and
accessories to the electronics system ................. 26
Carrying out the wiring......................................... 26
Installing the VRC DCF........................................ 26
Installing optional accessories............................. 26
Connecting the circulation pump ......................... 26
Checking the electrical installation ...................... 27
Completing installation......................................... 27
Start-up ............................................................... 27
Operating concept ............................................... 27
Starting up the heat pump system....................... 27
Running the installation assistants ...................... 28
Calling up the installer level................................. 28
Changing the set language.................................. 28
Heating mode flow temperature control............... 29
Activating cooling mode....................................... 29
Calling up statistics .............................................. 29
Checking that the product works correctly........... 29
Setting parameters .............................................. 29
Setting the high-efficiency pumps........................ 29
Handing the product over to the end user ........... 32
Troubleshooting ................................................ 32
Checking fault codes ........................................... 32
Querying the fault memory .................................. 33
Resetting the fault memory.................................. 33
Restarting the installation assistant ..................... 33
Using check programmes.................................... 33
Carrying out the actuator test .............................. 33
Electric back-up heater circuit breaker ................ 33
Inspection and maintenance ............................ 33
Inspection and maintenance information............. 33
Procuring spare parts .......................................... 33
Checking maintenance messages....................... 34
Inspection and maintenance check-list................ 34
Carrying out a restart and test operation ............. 35
Decommissioning.............................................. 35
Temporarily decommissioning the product.......... 35
Decommissioning the product ............................. 35
Recycling and disposal..................................... 35
Disposing of the brine fluid .................................. 35
Arranging disposal of refrigerant ......................... 35
Customer service............................................... 35
Appendix ............................................................................ 36
A
Heat pump schematic........................................ 36