0020213394_05 Installation and maintenance instructions
35
12.7
Carrying out a restart and test operation
Warning.
Risk of burns due to hot and cold com-
ponents.
There is a risk of burns from any uninsu-
lated pipelines and from the electric back-
up heater.
▶
Before starting up the unit, install any cas-
ing sections that have been removed.
1.
Start up the heat pump system.
2.
Check that the heat pump system is working without
any problems.
13 Decommissioning
13.1
Temporarily decommissioning the product
1.
Use the partition that is installed on-site (e.g. fuses or
power switches) to disconnect the product from the
power supply.
2.
Observe the requirements for the installation site re-
garding frost protection. (
13.2
Decommissioning the product
1.
Use the partition that is installed on-site (e.g. fuses or
power switches) to disconnect the product from the
power supply.
2.
Drain the product.
3.
Dispose of the product and the operating materials in
accordance with the national regulations.
14 Recycling and disposal
Disposing of the packaging
▶
Dispose of the packaging correctly.
▶
Observe all relevant regulations.
Disposing of the product and accessories
▶
Do not dispose of the product or the accessories with
household waste.
▶
Dispose of the product and all accessories correctly.
▶
Observe all relevant regulations.
14.1
Disposing of the brine fluid
▶
Ensure that the brine fluid is disposed of in compliance
with local regulations, for example, at an appropriate
waste site or waste incineration plant.
▶
For smaller volumes, contact your local disposal com-
pany.
14.2
Arranging disposal of refrigerant
The product is filled with R410A refrigerant.
▶
Refrigerant must only be disposed of by a qualified com-
petent person who holds a refrigerant-handling certific-
ate.
15 Customer service
For contact details for our customer service department, you
can write to the address that is provided on the back page,
or you can visit www.vaillant.co.uk.