0020213394_05 Installation and maintenance instructions
65
© Heating and Hotwater Industry Council (HHIC)
www.hhic.org.uk
* All installations in England and Wales must be notified to Local Authority Building Control (LABC) either directly or through a
Competent Persons Scheme. A Building Regulations Compliance Certificate will then be issued to the customer.
Issue date: 20.08.2020
SERVICE RECORD
It is recommended that your heating system is serviced regularly and that the appropriate Service Interval Record is completed.
Service provider
Before completing the appropriate Service Record below, please ensure you have carried out the service as described in the manufacturer’s instructions.
Always use the manufacturer’s specified spare part when replacing controls.
*A System inhibitor efficacy test is required on every annual service in accordance with the manufacturers’ instructions and BS 7593. It is only acceptable to not have under
-
taken this if the service engineers attendance visit was in between annual services to attend a non-water facing component.
SERVICE 01
Date:
Engineer name:
Company name:
Telephone No:
Operative ID No:
System inhibitor concentration has been checked and appropriate
action taken, in accordance with BS 7593 and heat pump
manufacturers’ instructions. *
Yes
N/a
Comments:
Signature:
SERVICE 01
Date:
Engineer name:
Company name:
Telephone No:
Operative ID No:
System inhibitor concentration has been checked and appropriate
action taken, in accordance with BS 7593 and heat pump
manufacturers’ instructions. *
Yes
N/a
Comments:
Signature:
SERVICE 01
Date:
Engineer name:
Company name:
Telephone No:
Operative ID No:
System inhibitor concentration has been checked and appropriate
action taken, in accordance with BS 7593 and heat pump
manufacturers’ instructions. *
Yes
N/a
Comments:
Signature:
SERVICE 01
Date:
Engineer name:
Company name:
Telephone No:
Operative ID No:
System inhibitor concentration has been checked and appropriate
action taken, in accordance with BS 7593 and heat pump
manufacturers’ instructions. *
Yes
N/a
Comments:
Signature:
SERVICE 01
Date:
Engineer name:
Company name:
Telephone No:
Operative ID No:
System inhibitor concentration has been checked and appropriate
action taken, in accordance with BS 7593 and heat pump
manufacturers’ instructions. *
Yes
N/a
Comments:
Signature:
SERVICE 01
Date:
Engineer name:
Company name:
Telephone No:
Operative ID No:
System inhibitor concentration has been checked and appropriate
action taken, in accordance with BS 7593 and heat pump
manufacturers’ instructions. *
Yes
N/a
Comments:
Signature: