Inspection and maintenance work
The table below lists the manufacturer requirements with respect to minimum inspection and maintenance intervals. If na-
tional regulations and directives require shorter inspection and maintenance intervals, you should observe these instead of
the intervals listed. Each time inspection and maintenance work is carried out, carry out the required preparatory and com-
pletion work.
#
Maintenance work
Interval
1
Cleaning the combustion chamber and rinsing the siphon at the same
time
If required, at least every
2 years
2
Checking the burner for dirt and damage
Annually
3
Checking the clearance between the electrodes and to the burner
Annually
4
Checking and correcting the system pressure (
→
Operating instructions)
Annually
5
Checking the general condition and removing any dirt
Annually
6
Checking the condensate siphon and, if required, filling the siphon
Annually
7
Run the test operation on the product/heating installation including hot
water generation (if available) and, if required, purge the product/heating
installation
Annually
8
Checking the ignition and burning behaviour under d.44
Annually
9
Checking and, if required, setting the CO
₂
content
Annually
10
Checking the product for tightness in the gas, flue gas, domestic hot wa-
ter and condensate pipework
Annually
11
Checking all the safety devices
Annually
12
Checking and, if required, resetting the (external) control
Annually
13
Carrying out maintenance work on the domestic hot water cylinder (if in-
stalled)
Every 5 years
14
Logging any inspection/maintenance work and flue gas measured values
Annually
I
Commissioning checklist
No.
Procedure
Comment
Required tool
1
Checking the gas connection pressure
The gas flow pressure relative to the
atmospheric pressure must be 1.7-
2.5 MPa (17-25 mbar) with natural
gases. The resting pressure for natural
gas must not deviate from the gas
flow pressure by more than 1.0 MPa
(10 mbar).
U-tube or digital manometer
2
Check whether the siphon has been
filled
If required, fill it via the flue spigot (at
least 1.5 l water)
3
Check the electrical connection
Power supply: Terminals L, N, PE
Control terminals: "Bus", or 7-8-9 or 3-4
4
Switch on the product, the display view
is active
Otherwise, check the fuses (4 OT)
5
Activate the chimney sweep mode
Press the
+
and
−
buttons at the same
time
6
Check the entire gas route for leaks
Leak detection spray or leak detector
(a leak detector is especially recom-
mended for checking the burner seals
for gas tightness)
If required, tighten the burner seal.
Leak detector
7
CO
₂
measurement
Target value for nominal heat input:
–
9.2 vol.%
±
0.3 with natural gas H
Only carry out the measurement after
five minutes of normal operation
CO
₂
analyser