Index
0020200969_04 Installation manual
39
Index
A
Adjusting the deflector......................................................... 19
Air/flue gas system ........................................................ 26
–
27
Air/flue gas system, installing a connection......................... 27
Assembling the vertical roof duct, 60/100 mm diameter ..... 22
B
Black terminal...................................................................... 18
C
CE certification ...................................................................... 5
Change of colour ........................................................... 18
–
19
Channel vent, minimum clearances ...................................... 4
Clearance from the external wall......................................... 14
Competent person................................................................. 3
Correctly aligning the elbows .............................................. 29
D
Deflector set ........................................................................ 19
Determining the pipe length of the direct, telescopic
60/100 mm diameter wall duct ............................................ 16
Disposing of condensate ....................................................... 9
Documents ............................................................................ 6
E
Eaves .................................................................................. 21
End pipe ........................................................................ 18, 21
Extensions........................................................................... 20
F
Flue gas route ....................................................................... 3
G
Grease................................................................................... 3
H
Horizontal roof duct, installing ............................................. 16
Horizontal wall duct, installing ............................................. 15
Horizontal wall/roof duct, preparing the installation............. 13
I
Ice formation.......................................................................... 4
Installing extensions ............................................................ 28
Installing the 60/100 mm diameter flat-roof duct ................. 23
Installing the 60/100 mm diameter pitched-roof duct .......... 23
Installing the 80/125 mm diameter connection piece .......... 13
Installing the 80/125 mm diameter flat-roof duct ................. 26
Installing the 80/125 mm diameter pitched-roof duct .......... 25
Installing the air clamps....................................................... 37
Installing the sliding sleeve.................................................. 27
L
Lightning................................................................................ 4
M
M8 threaded rods ................................................................ 21
O
Opening................................................................................. 3
Opening piece ..................................................................... 18
Q
Qualification........................................................................... 3
R
Regulations ........................................................................... 5
Ridge tiles............................................................................ 24
S
Seal ....................................................................................... 3
Securing the telescopic extension....................................... 37
Securing the telescopic pipe ............................................... 17
Shortening the air/flue gas pipe........................................... 14
T
Terminal
Black .............................................................................. 18
Tool ....................................................................................... 5
V
Variable terminal kit............................................................. 20