5 Installation
22
Installation manual 0020200969_04
5.4.5.2 Installing the wall duct
150-155
15
3°
1
1.
Drill a hole.
–
Diameter: 130 mm
2.
Insert the flue pipe
(1)
into the wall opening.
3.
Secure the flue pipe with mortar and leave the mortar to
harden.
4.
Install the wall collar on the inside and outside of the
wall.
5.4.5.3 Installing the roof duct
150-155
15
3°
1
▶
Insert the air/flue pipe
(1)
without the external collar into
the dormer.
5.4.5.4 Connecting the product
7
6
5
1
2
3
4
1.
Install the product
(4)
–
see the installation instructions
for the product.
2.
If required, replace the connection piece for the air/flue
pipe
(3)
, see the installation instructions for the product.
3.
Connect the connection elbow
(2)
to the connection
piece for the air/flue pipe
(3)
.
4.
Insert the partition
(5)
with the sleeve as far as it will go
in the wall/roof duct
(7)
or the extension
(6)
.
5.
If required, install the extensions.
6.
Connect the sliding sleeve to the connection elbow.
7.
Install the air clamp
(1)
for the sliding sleeve.
8.
Alternatives 1 / 2
Conditions
: Wall/roof duct without extension
▶
Install the sliding sleeve. (
→
Page 27)
8.
Alternatives 2 / 2
Conditions
: Wall/roof duct with extension
▶
Install the extensions. (
→
Page 28)
▶
Install the 45° elbow. (
→
Page 33)
▶
Install the 87° elbow. (
→
Page 35)
▶
Install the sliding sleeve. (
→
Page 27)
▶
Connect all of the disconnection points with air
clamps. (
→
Page 37)
5.5
Installing the vertical roof duct
5.5.1
Installation instructions
Danger!
Risk of poisoning due to escaping flue
gas and risk of material damage due to the
roof duct shearing off.
Snow and ice sliding down pitched roofs may
break off the vertical roof duct where it exits
the roof.
▶
In regions where heavy snow
falls/extensive ice formation can be ex-
pected, install the vertical roof duct close
to the ridge or install a snow guard mesh
above the roof duct.
The vertical roof ducts can be shortened under the roof.
However, to ensure that the fixing bracket is secured tightly,
the lengths must still be sufficient.
▶
Shorten the flue pipe and the air pipe by the same length.
5.5.2
Installing the vertical roof duct, 60/100 mm
diameter
5.5.2.1 Assembling the vertical roof duct
Note
When delivered, the lower pipe of the vertical roof
duct is pushed into the upper pipe.