5 Installation
14
Installation manual 0020200969_04
Conditions
: Top connection, air/flue pipe to the side
A
A =
125 mm
If you want to install the air/flue pipe laterally, you can de-
termine the position of the wall duct by carefully offsetting the
central line of the wall duct that is marked on the installation
template.
▶
Calculate the required gradient in accordance with the
length of the flue gas pipe and then mark the position for
the wall duct.
5.2.2
Determining the clearance to the external
wall
A
140
A
B
140
1.
2.
1.
Flue gas pipe to the
rear
2.
Flue gas pipe to the
side
A
Clearance to the ex-
ternal wall
B
Clearance to the in-
ternal wall: 125 mm
▶
Measure the clearance
(A)
from outside of the wall to the
centre of the connection piece.
5.2.3
Installing the 60/100 mm diameter
horizontal wall/roof duct, article number
0020219517
5.2.3.1 Scope of delivery
65
832
Ø167
65
30
40
1
2
3
4
5
1
Wall collar, 100 dia-
meter (2 pcs)
2
Horizontal wall duct
3
40 mm clamp
4
87° elbow
5
30 mm clamp
5.2.3.2 Shortening the air/flue gas pipe
1.
Determine the clearance to the external wall.
(
→
Page 14)
A + 75
13
2.
Shorten the flue gas pipe and the air pipe by the same
length when they are assembled.
Note
Disassembling the flue gas pipe and the air
pipe damages the latching lugs in the ter-
minal.
Conditions
: Additional extensions and elbows required
▶
Install the extensions. (
→
Page 28)
–
All of the sleeves for the flue gas pipe must point
towards the terminal.
▶
Install the 45° elbow. (
→
Page 31)
▶
Install the 87° elbow. (
→
Page 32)
5.2.3.3 Installing the wall duct
13
3°
1
140
1.
Drill a hole.