Assembly instructions
14
14.04.2014
ver. 2
2.2
Assembly
1 Unload the preimplements and the two connector from the frame.
2 Disassemble the transport support. See “Figure 2.1”. (Please return the support to Väderstad-
Verken).
3 Assemble the preimplement in the quick connector supports as shown in “Figure 2.2”, A - C,
using a traversing crane or a loader. Be sure to lock the preimplements using cotters and lock-
ing pins (D).
Figure 2.2
A
B
C
D
Содержание Rexius Twin Series
Страница 2: ...2 14 04 2014 ver 2 ...
Страница 4: ...4 14 04 2014 ver 2 ...
Страница 12: ...Safety precautions 12 14 04 2014 ver 2 ...
Страница 27: ......