7
Calibration
Figure 7.1
Calibration of delivered seed
Calibration of fertiliser
Calibration of BioDrill
Calibration of radar
Calibrate oil flow.
Values are displayed either in metric or imperial units,
depending on which one has been selected in the basic
settings menu.
7.1
Seed
Note the set sown amount, pulses/kg and the
actual sown amount for future use
Figure 7.2
Display
A. Calculates the number of pulses.
B. Calculates the number of pulses/kg. (You can also
specify pulses/kg manually by pressing the row and
entering the value in the pop-up window).
Settings in the calibration menu
C. Specify the weight of the contents of the calibration
bag.
D. Specify the required seed application rate.
E. Set the required percentage increase/decrease in the
feed volume in the adjustment of sown amount. If you
select e.g. 5%, the sown amount will change in
increments of 5% every time the button is pressed in
the operations menu.
F. Output, for filling the output system. Also resets the
pulse counter.
G. Calibrate.
Perform calibration
1. Specify the required seed application rate.
2. Set the required percentage increase/decrease of feed
output in the variable rate field.
3. Fit the calibration bag.
4. Fill the feed system.
5. Empty the calibration bag and refit it.
6. Select the calibration button and hold this button
down until the right amount of seed has been fed into
the calibration bag.
The pulses from the seed feed are calculated alongside
the pulse symbol.
7. Weigh the contents of the calibration bag.
8. State the weight of the content in the designated field.
The number of pulses is calculated.
9. The values are saved without having to be confirmed.
903099-en-gb; 19.01.2021
21
Содержание Rapid Series
Страница 1: ...903099 en gb 19 01 2021 07 Original instructions Instructions E services Rapid Version 1 6 3...
Страница 2: ...V derstad Holding AB V derstad Sweden 2018 903099 en gb 19 01 2021...
Страница 4: ......
Страница 33: ...Information Figure 11 3 WorkStation 1 outputs Figure 11 4 WorkStation 1 information 903099 en gb 19 01 2021 29...
Страница 34: ...Information Figure 11 5 Workstation 2 inputs Figure 11 6 Workstation 2 outputs 30 903099 en gb 19 01 2021...
Страница 35: ...Information Figure 11 7 WorkStation 2 information 903099 en gb 19 01 2021 31...
Страница 48: ...Where farming starts V derstad AB SE 590 21 V DERSTAD Sweden Phone 46 142 820 00 www vaderstad com...