If the metering units do not move:
See alarm no. 31
If the alarm appears although the
seed meters:
See alarm no. 31
33. Seed feed, BioDrill rotation LH
and RH
This alarm is triggered if the left and
right halves of the machine emit
alarms at the same time.
See alarm no. 31
40. Hydaulic motor, seed
Check the wiring, connectors and connections of the sensor.
Check the oil flow rate
50. Hydraulic motor, BioDrill
Check the wiring, connectors and connections of the sensor.
Check the oil flow rate
60. Low level, seed
Check the seed level in the hopper.
If there is seed in the hopper:
The sensitivity of the sensor has been incorrectly set.
70. 70 Low level, grass (BioDrill)
See alarm no 60
80. Seed valve, max power
Perform a new calibration
Check the oil flow rate
90. BioDrill valve, max power
Perform a new calibration
Check the oil flow rate
101. Voltage low, WorkStation 1
Inspect the connections and connectors of the intermediate cable. The
functions of the hydraulic system solenoid valves, etc. may cease to work.
Voltage to WS1 too low:
If the machine has a WS2, check the connection to WS2.
111. Voltage low, WorkStation 2
Voltage to WS2 too low:
Inspect the connections and connectors of the intermediate cable. The
functions of the hydraulic system solenoid valves, etc. may cease to work.
181. Tramlining LH
Check the wiring, connectors and connections of the sensor.
No signal for tramlining:
Check the sensor.
Tramlining active:
Check the connection.
182. Tramlining, right
See alarm no. 181
183. Tramlining LH+RH failure
See alarm no. 181
190. No speed
No speed is displayed despite the
machine being lowered to drilling
position and driven forwards:
Check the radar setting.
Check that the radar connection cables are not damaged.
903099-en-gb; 19.01.2021
33
Содержание Rapid Series
Страница 1: ...903099 en gb 19 01 2021 07 Original instructions Instructions E services Rapid Version 1 6 3...
Страница 2: ...V derstad Holding AB V derstad Sweden 2018 903099 en gb 19 01 2021...
Страница 4: ......
Страница 33: ...Information Figure 11 3 WorkStation 1 outputs Figure 11 4 WorkStation 1 information 903099 en gb 19 01 2021 29...
Страница 34: ...Information Figure 11 5 Workstation 2 inputs Figure 11 6 Workstation 2 outputs 30 903099 en gb 19 01 2021...
Страница 35: ...Information Figure 11 7 WorkStation 2 information 903099 en gb 19 01 2021 31...
Страница 48: ...Where farming starts V derstad AB SE 590 21 V DERSTAD Sweden Phone 46 142 820 00 www vaderstad com...