The calibration result becomes the baseline value.
Always check the actual feed rate on the field. If
necessary correct the pulses/kg. Example: If the
actual sown amount is 10% too low, increase the
pulses/kg by 10%. Note the set sown amount,
pulses/kg and the actual sown amount for future
use.
7.1.1
Seed output stops
If output is ongoing when calibration is selected,
output will be stopped. A pop-up window will
appear indicating this and confirmation will be
required in order to continue.
Figure 7.3
7.2
Fertiliser
The fertiliser volume is calibrated in the same way as for
the seed amount. See
.
7.3
BioDrill
BioDrill is calibrated in the same way as for the seed
amount. See
.
7.4
Radar
Figure 7.4
Fields on the screen:
A. Resets and starts the measurement.
B. Finishes the calibration sequence.
C. Shows the total number of radar pulses during
calibration.
D. Field to enter the distance driven when calibrating.
E. Shows calibration result as the number of radar
pulses/m. (The factory default setting is 99 pulses).
Calibrating the radar:
1. Measure an optional distance (at least 100 m).
2. Press ‘A’ at the starting point to begin the
measurement.
3. Press ‘B’ once the measured distance has been driven.
4. Press the ‘D’ field and enter the distance driven in
metres. Number of pulses per metre driven is
calculated and adjusted automatically in field ‘E’.
5. Press button ‘B’ to finish the measurement.
Alternatively, you can drive the measured
distance with the machine lowered to the drilling
position and stop the machine at the end point of
the distance. Specify the driven distance in field
‘D’ and press button ‘B’ to discontinue
measurement.
22
903099-en-gb; 19.01.2021
Содержание Rapid Series
Страница 1: ...903099 en gb 19 01 2021 07 Original instructions Instructions E services Rapid Version 1 6 3...
Страница 2: ...V derstad Holding AB V derstad Sweden 2018 903099 en gb 19 01 2021...
Страница 4: ......
Страница 33: ...Information Figure 11 3 WorkStation 1 outputs Figure 11 4 WorkStation 1 information 903099 en gb 19 01 2021 29...
Страница 34: ...Information Figure 11 5 Workstation 2 inputs Figure 11 6 Workstation 2 outputs 30 903099 en gb 19 01 2021...
Страница 35: ...Information Figure 11 7 WorkStation 2 information 903099 en gb 19 01 2021 31...
Страница 48: ...Where farming starts V derstad AB SE 590 21 V DERSTAD Sweden Phone 46 142 820 00 www vaderstad com...