Service and maintenance
34
11.07.2011
ver. 3
4.5
Retightening and checking the tine linkage
Figure 4.6
The screw connections in the tine linkage must be retightened after the first day of operation and
thereafter at least once per season. If retightening is not carried out, considerable wear will occur
in the tines’ mounts. Tighten the screw connections to a torque of 114 Nm. Use a torque wrench.
Ensure that the sleeves (B) protrude by the same amount on each side of the mounting plates.
Figure 4.7
B
B
B
B
KG
11,4
= 114 Nm
1 m
Содержание Cultus Series
Страница 2: ...2 11 07 2011 ver 3...
Страница 4: ...4 11 07 2011 ver 3...
Страница 37: ...CS 300 400 11 07 2011 ver 3 37 5 Hydraulic diagram 5 1 CS 300 400 Figure 5 1...
Страница 41: ......