D292104.8a.fm
Preparing to Run a Pre-programmed Job
Chapter 6: Operation
6- 11
Run the Job
1.
Close the enclosure doors, then open the HMI
Run Tab
and press
Run
.
During operation, the operator will add additional parts to the
Tape Feeder
and
unload packaged parts from the
Taper
as necessary. The operator may also
replace parts that fail 2D Inspection. Otherwise no other adjustments are required
for a job that has already been defined properly.
2.
When the preset number of parts has been run, the TM-401 will automatically stop
operation.
3.
Cut the sealed tape at the cut point and use a piece of blue Permacel tape to
secure the finished reel. Remove processed output.
Step 8:
Run
Job
Содержание TM-401
Страница 4: ......
Страница 74: ...3 32 TM 401 User s Guide Run Tab D292104 6 fm ...
Страница 146: ...5 44 TM 403 User s Guide Configure Inspection D292104 16 fm ...
Страница 158: ...6 12 TM 401 User s Guide Preparing to Run a Pre programmed Job D292104 8a fm ...
Страница 188: ...7 30 TM 401 User s Guide Adjusting PSA Seal Quality D292104 9a fm ...
Страница 199: ...Appendix A Sensors Contents Keyence FS N11CVP FS N12CP Sensor Amplifiers A 2 SMC ZSE30 Vacuum Sensor A 4 ...
Страница 204: ...Appendix A Sensors A 6 SMC ZSE30 Vacuum Sensor D292104 11 fm ...
Страница 208: ......
Страница 284: ......
Страница 286: ...Service and Parts Contacts 61053915 fm Page 2 ...
Страница 288: ...TM 401 Document List D292104 15b fm Page 2 ...
Страница 290: ......
Страница 291: ......
Страница 292: ...751 Summit Avenue Mankato MN 56001 507 387 2039 FAX 507 387 2257 www vtekusa com Email info vtekusa com ...