2GN/2GP/2GR
1-2-5
1. Remove two tapes.
2. Pull the lever and operation section is low-
ered.
3. Remove two spacers.
Remove waste textile on the operation
panel, if any.
4. Remove the pad.
5. Remove the tape holding the power cord.
Figure 1-2-4
1. Install the optional paper feeder as necessary
2. Verify levelness at the four corners of the platen using a level gauge, and
adjust the level bolts at the bottom of the machine to optimize levelness.
1. Turn the lever of the machine rear side with
the tool to release the lever holding the mir-
ror 1 and 2 frames.
Figure 1-2-5
Remove the tapes, spacers and pad.
Tape
Tape
Pad
Spacers
Install the optional paper feeder.
Release the lever holding mirror 1 and 2 frames.
Lever
Содержание CD 1230
Страница 1: ...Service Manual Copy CD 1230 CD 1240 CD 1250 Version 1 0 Date 04 07 2006 2GNSM060 ...
Страница 2: ...Service Manual Copy DC 2230 DC 2240 DC 2250 Version 1 0 Date 04 07 2006 2GNSM060 ...
Страница 4: ...Revision history Revision Date Replaced pages Remarks ...
Страница 5: ...This page is intentionally left blank ...
Страница 113: ...2GN 2GP 2GR 1 3 82 ...
Страница 231: ...2GN 2GP 2GR 2 2 6 ...
Страница 253: ...INSTALLATION GUIDE FOR THE DOCUMENT PROCESSOR ...
Страница 275: ...INSTALLATION GUIDE FOR BUILT IN FINISHER ...
Страница 288: ...INSTALLATION GUIDE FOR JOB SEPARATOR ...
Страница 297: ...INSTALLATION GUIDE FOR FAX System M ...
Страница 300: ...INSTALLATION GUIDE FOR Data Security Kit C ...