Insert battery by lining up
▽
mark on tool casing and
the white mark on battery pack.
4. Operation
4.1 Socket
・
Use impact sockets in good condition. Worn or ill-fitting sockets reduce power.
Replace worn sockets to prevent vibration, loss in torque output, poor accuracy
and damage to the output drive. Poor condition or hand sockets and accessories
can shatter and become a projectile.
・
A heavy (big) socket and / or accessory may damage the power tool and cause high vibration.
・
Guided deep engagement socket is recommended to minimise torque loss and vibration.
Consult your local
URYU distributor or URYU Japan for proper sockets.
・
A universal joint socket or a socket connector reduces torque output.
・
To attach socket to the tool, connect female 3/8
” square drive socket and anvil by depressing retainer pin.
4.2 Direction Of Rotation
4.3
LED Work Light
Pull the trigger and the LED work light illuminates work area.
Never look directly into the LED work light
while it is on or shine the light into other persons’ eyes.
4.4 Torque Setting
Torque setting is made with UCC-100Z, coordinator.
See UCC-100Z instruction manual for details.
Never touch the oil plug and the relief valve in the pulse unit
for torque adjustment. Relief valve adjusts output only after
maintenance. Removal of oil plug will result in oil leakage.
4.5 Preparation For Operation
1) Turn UCC-100Z ON.
See UCC-100Z instruction manual for details.
2) Insert Battery into the Tool.
14
・
Note the position of the forward / reverse lever before operating the tool.
Be aware of the direction of rotation.
Set Fwd / Rev lever to
R
for
clockwise
rotation.
Set Fwd / Rev lever to
L
for
anticlockwise
rotation.
Fwd / Rev Lever
Line up the positions.
White LED
Relief Valve
Oil Plug
Содержание UBX-AF Series
Страница 20: ...Exploded View 18...
Страница 25: ......