background image

3. Components & Function 

 

3.1    Tool Appearance 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

Index 

Part 

Purpose 

Reference 

1) 

Anvil 

Rotating part to fit socket depending upon purpose. 

Square Anvil Type 

2) 

Trigger 

Operates (ON/OFF) the tool 

 

3) 

Fwd / Rev Lever 

Changes the direction of rotation 

Operator can change rotations by single 

hand. 

4) 

LED Work Light 

Illuminates work area 

LED helps to install fasteners in dark areas. 

5) 

OK/NOK Judgement LED Tube 

Fastening Judgement 

Green: OK

 

Red: NOK

 

6) 

Grip Switch 

Activates the built-in controller unit 

 

7) 

Battery Power Indicator 

Indicates charge capacity level of the battery 

Green indicates that the battery pack is over 

40% of its charge capacity. 

  Keep using. 

Amber indicates that the battery pack is 40% or 

less of its charge capacity. 

Red indicates that the battery pack is nearly 

depleted and needs recharging immediately. 

Off:

 EMPTY (Battery level 0%) 

Note: Tool will stop after completion of the 

last tightening when the battery power 

indicator turns red. 

8) 

Suspension Bail & Suspension Hole 

Suspends the tool 

8)-1: Suspension Ring Assembly (option) 

9) 

ZigBee Communication LED 

Confirms ZigBee communication 

When it is ON, ZigBee communication is 

alive.   

10) 

PAN ID changing spot 

Changes ZigBee communication ID by the switch 

 

11) 

Setting writing spot 

Writes ZigBee communication setting 

 

12) 

Handle 

Gripping area while operating and carrying the tool 

 

12 

10) PAN ID changing spot

 

9) ZigBee Communication LED 

7) Battery Power Indicator 

1)

 

Anvil 

UBX-AF*00Z

 

8) Suspension Bail Hole 

8)-1Suspension Ring Assembly 

(option) 

Motor 

6) Grip Switch 

Ventilator 

Pulse Unit 

Sensor 

4) LED Work Light 

2) Trigger 

3) Fwd / Rev Lever 

5)OK/NOK Judgement LED Tube 

Battery 

Controller Section 

11) Setting writing spot

 

12) Handle 

Содержание UBX-AF Series

Страница 1: ...nd specifications provided with this power tool before installing operating repairing maintaining changing accessories on or working near the power tool Failure to follow all instructions in this manu...

Страница 2: ...ical Specifications 3 2 1 Tool Technical Specifications 3 2 2 ZigBee Specifications 4 Operation 4 1 Socket 4 2 Direction Of Rotation 4 3 LED Work Light 4 4 Torque Setting 4 5 Preparation For Operation...

Страница 3: ...clean and well lit Cluttered or dark areas invite accidents Do not operate power tools in explosive atmospheres such as in the presence of flammable liquids gases or dust Power tools create sparks whi...

Страница 4: ...e both hands available Remove any adjusting wrench before turning the power tool on A wrench left attached to a rotating part of the power tool may result in personal injury Do not overreach Keep prop...

Страница 5: ...d could result in a hazardous situation Keep handles and grasping surfaces dry clean and free from oil and grease Slippery handles and grasping surfaces do not allow for safe handling and control of t...

Страница 6: ...or at temperatures outside the specified range may damage the battery and increase the risk of fire Keep the battery and charger dry and away from water or any liquid as it may cause a short circuit...

Страница 7: ...cian immediately Hold the power tool with a light but safe grip taking account of the required hand reaction forces The risk from vibration is generally greater when the grip force is higher Wear warm...

Страница 8: ...with low noise low vibration and low torque reaction Vibration total value 2 5m s2 Sound pressure level 73dB 2 Battery Powered Cordless Flexible UBX AF tool provides you with flexible production line...

Страница 9: ...of an emergency such as earthquake Familiarise yourself with the followings to install and fix the system firmly 1 5 1 Place To Install 1 Install the system inside a building Never expose the system t...

Страница 10: ...DC14 4V DC14 4V DC18 0V Capacity 2 0Ah 3 0Ah 2 0Ah 4 0Ah 5 0Ah Usable Charging Time Approx 35 min Approx 35 min Approx 35 min Approx 50 min Approx 65 min Full Charging Time Approx 40 min Approx 40 mi...

Страница 11: ...d however it depends on working conditions When number of fasteners per full charge becomes about a half of the new battery condition replace the battery with a new one Replace only with the battery d...

Страница 12: ...Tool Battery Battery Pack obtain locally Wireless ZigBee Type PC for ID Setup not supplied with the product USB Serial Cable Option 910 396 0 UCC 100Z Coordinator f w ZigBee Receiver UBX AFZ Tool f w...

Страница 13: ...in use System Configuration Setup PC UCC 100Z Front panel UCC 100Z Rear panel Sequencer I O PLC PC Hub Socket Outlet UBX AFZ Tool Power Cable RS232C Cable 910 219 0 PC UCC 100Z etc ZigBee Wireless co...

Страница 14: ...s that the battery pack is nearly depleted and needs recharging immediately Off EMPTY Battery level 0 Note Tool will stop after completion of the last tightening when the battery power indicator turns...

Страница 15: ...o battery pack Note4 Settable combination of Motor Power Current Level and Motor Speed Range Current Level 1 13 1300min 1 48 4800min 1 Current Level 2 17 1700min 1 48 4800min 1 Current Level 3 21 2100...

Страница 16: ...ket and anvil by depressing retainer pin 4 2 Direction Of Rotation 4 3 LED Work Light Pull the trigger and the LED work light illuminates work area Never look directly into the LED work light while it...

Страница 17: ...mended to minimise torque down and wobbling 3 Pull the trigger firmly to operate the tool If the trigger is not pulled correctly the tool may not be stopped automatically 4 Torque drop can be seen whe...

Страница 18: ...le the red LED blinks This resets the heating protection even with the overheating motor Guidance of Suitable Applications for UBX AF series Example UBX AF700Z Working condition the same as the durabi...

Страница 19: ...ne third of the bearing with high quality grease Multemp PS No 2 see the right table or equivalent Overhaul It is recommended that after every 5 000 000 pulses or 6 months replace the pulse fluid It i...

Страница 20: ...Exploded View 18...

Страница 21: ...Noise Sheet 1 Motor Communication Cable Assembly 50 Fan Assembly 1 51 Nylon Mesh 1 52 Mesh Plate 1 53 Grip Switch 1 54 Grip Switch Plate 1 55 Control Board Assembly 1 60 ZigBee Board Assembly 1 61 Dip...

Страница 22: ...eed Excessive load Repair or replace Review parameters for Current and Speed Load reduction Ventilator does not work Breakage of ventilator Breakage of wire for ventilation inside the tool Repair or r...

Страница 23: ...e Value Angle High INITIAL ERROR Elapsed time from START to CUT is shorter than Initial Error Timer Torque reaches CUT before Initial Error timer is up Double hit error If the error appears with the n...

Страница 24: ...STATES RELATING TO THE MAKING AVAILABLE ON THE MARKET OF RADIO EQUIPMENT Harmonised Standards EN 62841 1 2015 EN 62841 1 1 2015 AC 2015 EN 62841 2 2 2014 EN 62841 2 2 2014 AC 2015 EN ISO 28927 2 2009...

Страница 25: ......

Страница 26: ...Distributed by For further information contact your nearest URYU distributor or URYU Japan International Dept 81 0 6 6973 9415 81 0 6 6972 0346 uryuair uryu co jp UBX AF 2020 11 12...

Отзывы: