Step
08
A
ss
em
bl
y
In
st
ru
ct
io
ns
R
ou
nd
-T
op
S
ust
ai
n
C
oo
p
V2
M
ay
3
0,
2
01
7
C
op
yr
ig
ht
®
U
rb
an
C
oo
p
C
om
pa
ny
a
ll
rig
ht
s
re
se
rv
ed
.
R
oo
st
S
qu
ar
in
g
1. Using a piece of string or a measuring tape, confirm that the distance from
back corner of the run to a point on the corner of the door frame are the same
(about 125 ½ inches) most importantly, the same.
2. "Rack" one side forward or backward while letting other side staying set the
coop until the measurements are the same +/- like an 1/8th of an inch.
Note:
This step is necessary before installing the roof metal on the next step
as the metal serves as a structural member to keep the coop "square" and
once it is installed it will not be moving again.
Make sure you like the
position of the coop.