Step
11
A
ss
em
bl
y
In
st
ru
ct
io
ns
R
ou
nd
-T
op
S
ust
ai
n
C
oo
p
V2
M
ay
3
0,
2
01
7
C
op
yr
ig
ht
®
U
rb
an
C
oo
p
C
om
pa
ny
a
ll
rig
ht
s
re
se
rv
ed
.
R
un
R
oo
f S
ect
io
n
Fig 11
Fig 11a
Fig 11b
Stand In These Open
Areas For Roof Screws
E3
Roof
Screw
11.1 Attach Run Roof Sides -
Using
Fig 11
and
Fig 11a
, Use
E1
Brown Screws and attach the
A8
and
A9
panels as indicated driving screws up through bottom sides of
A5
&
A6
into
the
A8
&
A9
Sides and back side screwed into bottom inside vertical rails of
B4's
. Next place front panel
A2
in (wire side in) and attach using
E1
Screws as indicated, making sure its
flush.
11.2 Finish Run Roof Frame -
Attach the
A10
Front Panel and
A13
Feed Holder Panel as is shown in
Fig 11c
uing
E1
Brown Screws. By stepping into open areas of run, Set the
A11
and
A12
Roof Frames as indicated in
Fig 11c
using
E1
Brown Screws. Make sure back of
A11
panel is screwed into bottom rail of the
B5
Middle Panel. Make all edges flush.
11.3 Screw Down Roof -
Attach the
B16
Roof Metal (see
Fig 11b
) using
E3
Roof Screws with (i) larger liped sides outward and (ii) rolled up lip back edge against roost. Use a screw
in all pre-drilled holes tightening just enough to push against rubber washer without crushing it. You will have to stand in the open areas of run.
A8
A9
A2
A10
A13
A11
A12
B16
Lipped Edge
B16
B4
Fig 11c
A5
A6
B5
A11
A9
A6
B4
B5