background image

Step

07

A

ss

em

bl

In

st

ru

ct

io

ns

R

ou

nd

-T

op

 S

ust

ai

C

oo

p

V2

 M

ay

 3

0,

 2

01

7

C

op

yr

ig

ht

 ®

 U

rb

an

 C

oo

C

om

pa

ny

 a

ll 

rig

ht

re

se

rv

ed

.  

R

oo

f S

up

po

rt 

Fr

am

Ea

ve

s

Fig 7

7.1 Identify Parts - 

Using the 

Fig 7 

illustration, collect parts for the roof Support Frame. There are 4 Identical 

B12

 Supports with notches in the end. There are 4 identical length 

B10

 

Outer Eave Boards with holes drilled along the top edge. There are 2 identical 

B11

 Boards with no notches, and 2 same length (longer) 

B11

 Eave Boards.

7.2 Outer Roof Supports - 

Using your hand, force tap with your palm the notch of 

B12 

Outer Roof Support boards into the notches on the 

B3

 Roost Ends (

Fig 7e

) and the notches of 

the 

B7 

Mid Arcs (

Fig 7b

) and then from the back side of the 

B7 

Mid Arcs use 

E2

 Green T-20 Screws and the T-20 Bit to drive a screw through the 

B7

 Arc into the end of the 

B12 

Supports. If 

B12

 won't fit by hand, you can tap lightly with a hammer on the top part that will be covered by roof metal. Repeat this procedure for the other end.

7.3 Middle Roof Supports - 

Using your hand, force tap with your palm the ends of 

B11

 Mid Roof Support boards into the pockets between the two 

B7

 Mid Roost Arcs and then from 

the back side of the 

B7

 Mid Arcs use 

E2

 Green T-20 Screws to drive a screw through the 

B7

 Arc into the end of the 

B11

 Supports. If 

B11

 won't fit by hand, you can tap lightly with a 

hammer on the top part that will be covered by roof metal. Repeat this procedure for both supports.

7.4 Eave Boards - 

Referencing the above illustrations, place the outer 

B10

 Eave Boards on the top beveled edges of the outer front and back panels jamming the inside of the eave up 

against the sides of the 

B7 

Arcs and the top edge (holes are along tops) against the nubs of the arcs. Drive 

E2

 Green screws into the pre-drilled holes in the Eave Boards to hold in 

place. 

B9

 Center Eave Boards jam up against the nubs of the 

B7

 Arcs and are centered left to right and are held in along top edge by 

E2

 Green T-20 Screws.

Fig 7c

Fig 7d

Notch

Notch

Screws to

Top of Eaves

B10 Outer Eaves

All 4 Same Length

B10

B10

B10

B9 Middle Eaves

2 Same Length

B9

B11

B12 

B12

E2 Green

T-20 Screw

Fig 7b

Fig 7e

B7 

B3

B12

B3

Force Fit

Eave Flush With Arc Nubs

Eave Screws On Top Edge

B12

B7

E5 Bit

Содержание Round-Top Sustain Coop

Страница 1: ...rs in the runs of coops A trimmed rubber mat or turf mat can be placed in the bottom of egg boxes or you may wish to put pine shavings them They are left wired so they can be cleaned in the event of a...

Страница 2: ...5 30 17 V2 You might find it easier to use digital instructions because you can ZOOM in on illustrations Digital Instructions http urbancoopcompany com assembly support Windows MacOs iOS Android...

Страница 3: ...rights reserved Orientation Front Left Right Back We recommend having the back side of your coop facing North Shown With Optional Accessories Optional Brooder Grow Out Box Optional Waterers Optional F...

Страница 4: ...5 10 Knots blemishes fraying coloring variations minor surface cracking slight warping and periodic worm marks are normal parts of rough cedar We try to make it to where a reversible part always has...

Страница 5: ...ry not to bury heads too deeply into the wood 1 2 Attach The 3 Units Together To Form Lower Back Assembly In a large flat area attach the three units built in Fig 1 into the Lower Back Assembly as ind...

Страница 6: ...ig 2 green arrows indicate direction and placement of screws making sure edges are flush Set aside 2 2 A15 A17 Right Side Fig 2 Using E1 Brown Screws attach Panel A15 to Panel A17 as shown in Fig 2b m...

Страница 7: ...nd a helper attach Back Panel Assembly to side panel assembly making note of overlaps and alignment Fig 3a and Fig 3b Repeat procedure for both sides A14 A15 Fig 3a Fig 3b Flush Door Up Off Ground A L...

Страница 8: ...ough top of A19 frame into the bottom of the B1 Door Panel making sure all edges are flush Carefully lower the door to access the pre drilled holes inside the door frame to screw the B1 side frame int...

Страница 9: ...racket and while holding in place as illustrated in Fig 5 and Fig 5a drive E1 Brown Screws through B1 Back Door Panel in the pre drilled holes landing them into the end of the B6 Support Bracket Using...

Страница 10: ...attach driving screws as indicated by arrows in Fig 6b 6 2 Install B5 Middle Front Panel As indicated in Fig 6 position the B7 Mid Arc aligning it as shown in Fig 6c and attaching it using two E1 Brow...

Страница 11: ...orts Using your hand force tap with your palm the ends of B11 Mid Roof Support boards into the pockets between the two B7 Mid Roost Arcs and then from the back side of the B7 Mid Arcs use E2 Green T 2...

Страница 12: ...f the door frame are the same about 125 inches most importantly the same 2 Rack one side forward or backward while letting other side staying set the coop until the measurements are the same like an 1...

Страница 13: ...ack side full sheet with Single V edge just overlapping front B12 support as shown in Fig 9a and 9b Keeping edges straight attach back side eave screws as shown in Fig 9d and 9e 1 2 3 2 While rolling...

Страница 14: ...d using E1 Brown Screws attach the back side of A5 A6 to the bottom inside corners of B4 Panels as illustrated in Fig 10a Wire faces down and make sure edge with pre drilled holes are facing to the mi...

Страница 15: ...sure its flush 11 2 Finish Run Roof Frame Attach the A10 Front Panel and A13 Feed Holder Panel as is shown in Fig 11c uing E1 Brown Screws By stepping into open areas of run Set the A11 and A12 Roof...

Страница 16: ...ches As illustrated in Fig 12c and Fig 12b attach the four D1 Gate Latches using provided screws into pre drilled holes on all four side run access doors First install door side bolt Second remove shi...

Страница 17: ...from bottom into sides 13 2 Attach Face As illustrated in Fig 13a attach the C3 Egg Box Face between the two sides If it does not force fit into place you may need to loosen side screws to make a litt...

Страница 18: ...ovided Brad Nail attach rain gutter flashing C7 as indicated in Fig 14a placing equal left to right 13 2 Attach Roof Assembly As illustrated in Fig 14b attach the C6 Egg Box Roof Assembly equally spac...

Страница 19: ...Fig 15b 15 2 Attach Box With the egg box lid up see Fig 15 use 2 E1 Brown Screws per side and screw through the block on the side of box from inside the box see Fig 15a and into the receiver frame Att...

Страница 20: ...L EZ Fill Feeder The run roof is designed to overhang the feeders to help keep feed dry in the rain Because of that it is necessary to tilt them to install and remove and you may find it easier to til...

Страница 21: ...es Rotate to seat 2nd force fit by pushing the nipple into the grommet Protect your hand with a towel if needed Fill Cap Poultry Nipples End Cap Back End of Waterer Rests in B17 Support Legs Roll Wate...

Страница 22: ...in Coop V2 May 30 2017 Copyright Urban Coop Company all rights reserved Optional Brooder Grow Out Box Orientation G5 Face G3 Right Side G3 Left Side G1 Front G13 Legs G12 Rubber Mats G6 Main Roof G7 S...

Страница 23: ...lly flip the assembly over align sides to face and front panels and when edges are flush use E1 Brown Screws to attach sides to front and face panels See Fig 19a 19 3 Connect Bottoms Using Fig 19b as...

Страница 24: ...Divider Frame as indicated in Fig 20a 20 2 Install Top Board Z Flashing Using provided brad nails pin down ends of 3 pieces of C7 Z Flashing to hold in place see Fig 20c Using 4 E2 Green Screws instal...

Страница 25: ...rd and centered left to right See Fig 21 21 3 Attach Front Roof Section Flip up G7 and using E2 Green Screws attach G6 Front Roof Section on top of the divider frame centered left to right See Fig 21...

Страница 26: ...nused holes with the embedded magnet facing inward and rotating the metal strip on the inside to the hole that is being plugged and letting plug magnet and bar connect The magnet is quite strong and t...

Страница 27: ...he angled chute in the feeder can have some of the material removed from the exit opening a little at a time until you achieve the performance you want 3 If you bought the waterer you will need to rot...

Отзывы: