Step
07
A
ss
em
bl
y
In
st
ru
ct
io
ns
R
ou
nd
-T
op
S
ust
ai
n
C
oo
p
V2
M
ay
3
0,
2
01
7
C
op
yr
ig
ht
®
U
rb
an
C
oo
p
C
om
pa
ny
a
ll
rig
ht
s
re
se
rv
ed
.
R
oo
f S
up
po
rt
Fr
am
e
&
Ea
ve
s
Fig 7
7.1 Identify Parts -
Using the
Fig 7
illustration, collect parts for the roof Support Frame. There are 4 Identical
B12
Supports with notches in the end. There are 4 identical length
B10
Outer Eave Boards with holes drilled along the top edge. There are 2 identical
B11
Boards with no notches, and 2 same length (longer)
B11
Eave Boards.
7.2 Outer Roof Supports -
Using your hand, force tap with your palm the notch of
B12
Outer Roof Support boards into the notches on the
B3
Roost Ends (
Fig 7e
) and the notches of
the
B7
Mid Arcs (
Fig 7b
) and then from the back side of the
B7
Mid Arcs use
E2
Green T-20 Screws and the T-20 Bit to drive a screw through the
B7
Arc into the end of the
B12
Supports. If
B12
won't fit by hand, you can tap lightly with a hammer on the top part that will be covered by roof metal. Repeat this procedure for the other end.
7.3 Middle Roof Supports -
Using your hand, force tap with your palm the ends of
B11
Mid Roof Support boards into the pockets between the two
B7
Mid Roost Arcs and then from
the back side of the
B7
Mid Arcs use
E2
Green T-20 Screws to drive a screw through the
B7
Arc into the end of the
B11
Supports. If
B11
won't fit by hand, you can tap lightly with a
hammer on the top part that will be covered by roof metal. Repeat this procedure for both supports.
7.4 Eave Boards -
Referencing the above illustrations, place the outer
B10
Eave Boards on the top beveled edges of the outer front and back panels jamming the inside of the eave up
against the sides of the
B7
Arcs and the top edge (holes are along tops) against the nubs of the arcs. Drive
E2
Green screws into the pre-drilled holes in the Eave Boards to hold in
place.
B9
Center Eave Boards jam up against the nubs of the
B7
Arcs and are centered left to right and are held in along top edge by
E2
Green T-20 Screws.
Fig 7c
Fig 7d
Notch
Notch
Screws to
Top of Eaves
B10 Outer Eaves
All 4 Same Length
B10
B10
B10
B9 Middle Eaves
2 Same Length
B9
B11
B12
B12
E2 Green
T-20 Screw
Fig 7b
Fig 7e
B7
B3
B12
B3
Force Fit
Eave Flush With Arc Nubs
Eave Screws On Top Edge
B12
B7
E5 Bit