Step
20
A
ss
em
bl
y
In
st
ru
ct
io
ns
R
ou
nd
-T
op
S
ust
ai
n
C
oo
p
V2
M
ay
3
0,
2
01
7
C
op
yr
ig
ht
®
U
rb
an
C
oo
p
C
om
pa
ny
a
ll
rig
ht
s
re
se
rv
ed
.
G
-
D
ivi
de
r &
F
la
sh
in
g
Fig 20b
Fig 20c
20.1 Install Divider -
Using
E1
Brown Screws install the G4 Divider as
indicated in
Fig 20.
Stand the box up on its side and drive E1 Screws
through the bottom into the Divider Frame as indicated in
Fig 20a.
20.2 Install Top Board & Z-Flashing -
Using provided brad nails, pin
down ends of 3 pieces of C7 Z-Flashing to hold in place, see
Fig 20c.
Using 4 E2 Green Screws, install C5 Top Board As indicated in
Fig 20b.
Hold Each Piece
Of Flashing
In Place With
1 Brad Nail On
Each End.
Fig 20
G4 Divider & Frame
Hardware Towards Face
Flush Edge
Centered Between V-Grooves
Screws In From Underneath
Fig 20a
Lip to Back
C7 Flashing
C5 Top Board
Flush
Flush
Overlap is OK
Bend As Needed
To Fit In Groove