background image

Roost Assembly

6

Attach B1 roost front to B3 roost sides as shown using E1 brown screws into pre-drilled holes. Top edge should leave a 

gap for one B7 eave board to fit into, and bottoms should be flush. Install B2 roost back to B3 roost sides. Tap B4 center 

roof support into slots on top of side and B5 mid-roof supports into brackets. Tap in other B7 eave board, and use E2 

green screws through the pre-drilled holes to screw into tops of B1 roost front and B2 roost back. Leave equal space on 

either side, centering eave boards.     

B1

B3

E1

B7

B2

B4

B5

B5

Flush at bottoms and sides

5

Run Top Assembly

A5

A6

A4

Wire side up, fit A5 side yard panel between A8 rear 

legs. Screw in E1 screws 1 and 2 with back edge 

flush. Rack frame to line up edges, then install E1  

screws 3 and 4. Optional waterer brackets are in 

corners.

Screw 1

Screw 2

Screws 3 & 4

E1 brown screws into pre-drilled holes.

© Urban Coop Company, all rights reserved.

Waterer Bracket

Wire up on all top panels

Note:

 See special 

supplement on 

reversing roost 

for this panel to 

accommodate 

orientation of egg 

box and roost 

door.

Next, place A6 extender panel butted up 

tight to A5 side yard panel. Finally, place A4 

ramp panel. Use pre-drilled screw holes 

around edges. If you think you need to 

bend out a frame to make a more flush 

edge, that's fine. Some bowing of cedar is 

expected and is normal. 

After this, tighten 

all bolts on run firmly into t-nuts. 

Optional:

 You can put an extra screw in 

middle from A4 to A6 in pre-drilled hole 

screwing them together. It makes top 

stronger in the middle.

This panel used in optional run

extension. See step 12 for details.

Содержание Backyard Chicken Coop

Страница 1: ...options you order the more important this becomes as these coops are quite large and you may become confused by panels that look similar You should expect extra fasteners to be left over In the rare o...

Страница 2: ...py healthy hens Placement Easy access to water and clear access to egg door and roost door is recommended Flat level high ground is best Some sunlight is not all bad The Galvalume roof does a good job...

Страница 3: ...Rail Is Wide Holes In Panel Ends No Wire A6 Top Run Extender Panel A8 Rear Legs 4 holes in Each top is beveled A9 Header Board long 2x4 with 2 holes in each end A10 Ramp Door A7 Front Legs have notch...

Страница 4: ...of Supports 2x B7 Eave Boards 2x B6 Roost Bars 2x Door B8 Roost Roof Panels 2x C4 Roof Panel Egg Box C1 C2 Left and Right Side of Egg Box C3 Egg Box Door Assembly Door D1 Roost Side shorter D2 Egg Box...

Страница 5: ...A9 Header Board A7 Front Leg E4 Wire on all lower panels faces inward Wider edge on tops Wider edge on tops Wider edge on tops Run Assembly 1 Assemble Sides Pick a level place for assembly With wire...

Страница 6: ...or out as needed to allow metal pins on brackets at bottom of legs to fit into holes on bottom rail of panel Rack the entire assembly from side to side if needed to make the gap on either side of the...

Страница 7: ...edge flush Rack frame to line up edges then install E1 screws 3 and 4 Optional waterer brackets are in corners Screw 1 Screw 2 Screws 3 4 E1 brown screws into pre drilled holes Urban Coop Company all...

Страница 8: ...the nail in door frame that holds it in place during shipping Before lifting roost onto run place B8 roost roof panels to where the grooves overlap with pre drilled holes on B4 center roof support an...

Страница 9: ...clear of leg post 5 Finally screw in bottom 3 E3 roof screws screwing down into C3 egg box door top rail B2 C4 Urban Coop Company all rights reserved Storage Planter Area Fence 10 14 Set back storage...

Страница 10: ...roost panel B1 using screws in latch kits Remove nail or screw in side of door frame that holds door in place for shipping You will need to squeeze latch body together a little for holes to line up N...

Страница 11: ...t and puddling occurs nipple may have been damaged or it may be clogged with debris Clean and inspect the nipple and if you still have the problem contact us and we will get you a new nipple sent out...

Страница 12: ...ordless Drill The Run Extension replaces the removable panel A3 of your coop and becomes a rigid removable sub assembly of your coop that attaches and detaches as a unit Panel A3 gets used in your Run...

Страница 13: ...he header board Run Extension continued Run Extension continued 12b 12a Step 4 Install provided karabiner clip onto closed hasp on both sides to securely attach run extension onto your coop This allow...

Страница 14: ...he end blocks on the outside of your coop by driving 1 screw down through each mid block into frame of extension with edges flush Use the Gold T20 screws to secure ends of boards by driving 2 screws i...

Страница 15: ...r Coop 2 so that the frames are sitting back to back as illustrated in Fig 13a on next page see steps 1 3 Step 13 2 Attach Thru Panel Attach Thru panel R2 to back edges of side panels A1 of Coop 1 usi...

Страница 16: ...Shown with optional run extensions installed...

Страница 17: ...6 R2 Ranchette Run Assembly Illustration 13a R3 R3 Run Extension or Panel A3 Goes On Ends of Coop Run Extension or Panel A3 Goes On Ends A5 A5 A4 A4 A9 A9 A1 A1 A1 A1 R1 Narrower of the 2 Fill Panels...

Страница 18: ...d the P5a side board on the side of the planter that has the roost door Use the P9 gauge block to correctly space the top of the box and mount the P5 and P5a boards using 4 P4 screws in each side maki...

Отзывы: