background image

Big Space Top

Smaller Space Down

P1

P2

P3

Equal Spaced

P4

14

Round-Top Planter Box

 (optional coop accesory)

P5

P5a

P6

P6

P7

Parts List:

1) Back Panel

2) Front Panel

3) Bottom

4) 1 5/8 Green T20 Screws

5) Longer Side Board

5a) Shorter Side Board

6) Bottom Side X2

7) 3” Brown T25 Screw

8) 3 ½” Green T25 Screw

9) 8 1/8” Gauge Block

P8

Note: Assembly will be easiest with two people and a flat table, like a picnic table

. (1) Place P1 & P2 panel 

top side down and screw bottom P3 onto it screwing 8 P4 screws through bottom into blocks on P1 & P2 sides. 

Don’t screw in too deeply as it may crack the wood.

(2) Attach the P5 side board on the eggbox side of the planter and the P5a side board on the side of the planter 

that has the roost door. Use the P9 gauge block to correctly space the top of the box and mount the P5 and P5a 

boards using 4 P4 screws in each side making edges flush and positioned as illustrated. Discard P9 when done.

(3) Attach the P6 bottom side board below the P5 and P5a boards to fill the hole using 3 P4 screws each.

(4) Position the assembled planter box onto the coop in lieu of the side yard boards shown in step 10. Attach end 

blocks of P5 and P5a to the roost and egg box using brown P7 screws and then sink one green P8 screw at an 

angle into the pre-drilled holes in the block, driving them into the tops of the run top rails. Press down on side 

panels to make sure they seat against the coop tightly.

P9

The Planter Box Replaces The D1, D2, D3 Yard Boards in Step 

10

End Block

P4 Screws

Содержание Backyard Chicken Coop

Страница 1: ...options you order the more important this becomes as these coops are quite large and you may become confused by panels that look similar You should expect extra fasteners to be left over In the rare o...

Страница 2: ...py healthy hens Placement Easy access to water and clear access to egg door and roost door is recommended Flat level high ground is best Some sunlight is not all bad The Galvalume roof does a good job...

Страница 3: ...Rail Is Wide Holes In Panel Ends No Wire A6 Top Run Extender Panel A8 Rear Legs 4 holes in Each top is beveled A9 Header Board long 2x4 with 2 holes in each end A10 Ramp Door A7 Front Legs have notch...

Страница 4: ...of Supports 2x B7 Eave Boards 2x B6 Roost Bars 2x Door B8 Roost Roof Panels 2x C4 Roof Panel Egg Box C1 C2 Left and Right Side of Egg Box C3 Egg Box Door Assembly Door D1 Roost Side shorter D2 Egg Box...

Страница 5: ...A9 Header Board A7 Front Leg E4 Wire on all lower panels faces inward Wider edge on tops Wider edge on tops Wider edge on tops Run Assembly 1 Assemble Sides Pick a level place for assembly With wire...

Страница 6: ...or out as needed to allow metal pins on brackets at bottom of legs to fit into holes on bottom rail of panel Rack the entire assembly from side to side if needed to make the gap on either side of the...

Страница 7: ...edge flush Rack frame to line up edges then install E1 screws 3 and 4 Optional waterer brackets are in corners Screw 1 Screw 2 Screws 3 4 E1 brown screws into pre drilled holes Urban Coop Company all...

Страница 8: ...the nail in door frame that holds it in place during shipping Before lifting roost onto run place B8 roost roof panels to where the grooves overlap with pre drilled holes on B4 center roof support an...

Страница 9: ...clear of leg post 5 Finally screw in bottom 3 E3 roof screws screwing down into C3 egg box door top rail B2 C4 Urban Coop Company all rights reserved Storage Planter Area Fence 10 14 Set back storage...

Страница 10: ...roost panel B1 using screws in latch kits Remove nail or screw in side of door frame that holds door in place for shipping You will need to squeeze latch body together a little for holes to line up N...

Страница 11: ...t and puddling occurs nipple may have been damaged or it may be clogged with debris Clean and inspect the nipple and if you still have the problem contact us and we will get you a new nipple sent out...

Страница 12: ...ordless Drill The Run Extension replaces the removable panel A3 of your coop and becomes a rigid removable sub assembly of your coop that attaches and detaches as a unit Panel A3 gets used in your Run...

Страница 13: ...he header board Run Extension continued Run Extension continued 12b 12a Step 4 Install provided karabiner clip onto closed hasp on both sides to securely attach run extension onto your coop This allow...

Страница 14: ...he end blocks on the outside of your coop by driving 1 screw down through each mid block into frame of extension with edges flush Use the Gold T20 screws to secure ends of boards by driving 2 screws i...

Страница 15: ...r Coop 2 so that the frames are sitting back to back as illustrated in Fig 13a on next page see steps 1 3 Step 13 2 Attach Thru Panel Attach Thru panel R2 to back edges of side panels A1 of Coop 1 usi...

Страница 16: ...Shown with optional run extensions installed...

Страница 17: ...6 R2 Ranchette Run Assembly Illustration 13a R3 R3 Run Extension or Panel A3 Goes On Ends of Coop Run Extension or Panel A3 Goes On Ends A5 A5 A4 A4 A9 A9 A1 A1 A1 A1 R1 Narrower of the 2 Fill Panels...

Страница 18: ...d the P5a side board on the side of the planter that has the roost door Use the P9 gauge block to correctly space the top of the box and mount the P5 and P5a boards using 4 P4 screws in each side maki...

Отзывы: