12
Run Extension
(optional accessory)
Note 1:
Your run extension uses four new provided panels and the
removable run panel A3 from your coop. You will discard the two
G3
locking hasps that held your removable panel onto your coop.
I
Note 2:
If you ordered a coop at the same time you purchased the
run extension,
G3
Hasps will not even be included.
Note 3:
If you ordered multiple nesting run extensions, the first
extension that hooks into the coops run will have the eye bolts on the
J1 panels on the inside edge, and each nesting extension will have its
eye bolts on the outside edges of panel J1.
Parts List:
Run Extension Comes In 1 Box
J. Yard Panels
1) Sides 2x (21 inches wide)
2) Tops 2x (25 inches wide)
3) 3 Run Trim Boards
K. Fasteners
1) 3” brown T25 screws x16
2) 1½” Gold Colored Screws x12
L. Tools Provided
If purchased separately from Coop
1) T25,T20 Torx bits
2) Phillips Bit
3) Magnetic Bit Holder
4) Filler Putty
M. Hardware
1) Hinged Hasps 2X
2) Karabiner clips 2X
N. Required Tools (not Provided)
1) Cordless Drill
The Run Extension replaces the removable
panel A3 of your coop and becomes a rigid
removable sub-assembly of your coop that
attaches and detaches as a unit. Panel A3
gets used in your Run Extension
Front panel A3 Door
E1 3” Screws into pre-drilled holes
around perimeter of J2’s after squaring up
on assembled sides and front. Also put in
2 screws on mid supports
for strength.
Side Panel J1
Side Panel J1
Flush On Top
With A3
J2 Panel No
Brackets
J2 Panel With Extra
Water & Feeder Brackets
Attach front door run panel A3 to ends of J1 panels using 4
E1 screws spaced as shown. Make tops flush. Attach to ends
without eye bolts with wire facing inwards. If you can, pre-drill
holes with 1/8th drill bit. If not, screws provided will pierce.
Attach panel J2 with brackets as shown flush up edges
with J1 sides and A3 door panel. Use E1 screws in
pre-drilled holes wire side down.
Repeat for other J2 panel
without the waterer and
feeder brackets
towards end with
eye bolts.
Side panels on
eye bolt end
extend beyond
top.
Eye Bolt
Screw 3”
From Top
Screw 3”
From Bottom
© Urban Coop Company, all rights reserved.
J2 top is
flush on
sides and
front A3
J1 Over Hangs
Wire Faces Into Run Extension
Содержание Backyard Chicken Coop
Страница 16: ...Shown with optional run extensions installed...