background image

12

Run Extension

 (optional accessory)

Note 1: 

Your run extension uses four new provided panels and the 

removable run panel A3 from your coop. You will discard the two 

G3

 

locking hasps that held your removable panel onto your coop.

I

Note 2:

 If you ordered a coop at the same time you purchased the 

run extension, 

G3

 Hasps will not even be included.

Note 3:

 If you ordered multiple nesting run extensions, the first 

extension that hooks into the coops run will have the eye bolts on the 

J1 panels on the inside edge, and each nesting extension will have its 

eye bolts on the outside edges of panel J1.

Parts List:

Run Extension Comes In 1 Box

J. Yard Panels

1) Sides 2x (21 inches wide)

2) Tops 2x (25 inches wide)

3) 3 Run Trim Boards

K. Fasteners

1) 3” brown T25 screws x16

2) 1½” Gold Colored Screws x12 

L. Tools Provided 

If purchased separately from Coop

1) T25,T20 Torx bits

2) Phillips Bit

3) Magnetic Bit Holder

4) Filler Putty

M. Hardware

1) Hinged Hasps 2X

2) Karabiner clips 2X

N. Required Tools (not Provided)

1) Cordless Drill

The Run Extension replaces the removable

panel A3 of your coop and becomes a rigid

removable sub-assembly of your coop that

attaches and detaches as a unit. Panel A3 

gets used in your Run Extension

Front panel A3 Door

E1 3” Screws into pre-drilled holes

around perimeter of J2’s  after squaring up

on assembled sides and front.  Also put in 

2 screws on mid supports 

for strength.

Side Panel J1

Side Panel J1
Flush On Top
With A3

J2 Panel No
Brackets

J2 Panel With Extra 

Water & Feeder Brackets

Attach front door run panel A3 to ends of J1 panels using 4 

E1 screws spaced as shown. Make tops flush. Attach to ends 

without eye bolts with wire facing inwards. If you can, pre-drill 

holes with 1/8th drill bit.  If not, screws provided will pierce.

Attach panel J2 with brackets as shown flush up edges

with J1 sides and A3 door panel. Use E1 screws in

pre-drilled holes wire side down.

Repeat for other J2 panel

without the waterer and 

feeder brackets 

towards end with 

eye bolts.

Side panels on

eye bolt end

extend beyond

top.

Eye Bolt

Screw 3”

From Top

Screw 3”

From Bottom

© Urban Coop Company, all rights reserved.

J2 top is

 flush on

  sides and

     front A3

J1 Over Hangs

Wire Faces Into Run Extension

Содержание Backyard Chicken Coop

Страница 1: ...options you order the more important this becomes as these coops are quite large and you may become confused by panels that look similar You should expect extra fasteners to be left over In the rare o...

Страница 2: ...py healthy hens Placement Easy access to water and clear access to egg door and roost door is recommended Flat level high ground is best Some sunlight is not all bad The Galvalume roof does a good job...

Страница 3: ...Rail Is Wide Holes In Panel Ends No Wire A6 Top Run Extender Panel A8 Rear Legs 4 holes in Each top is beveled A9 Header Board long 2x4 with 2 holes in each end A10 Ramp Door A7 Front Legs have notch...

Страница 4: ...of Supports 2x B7 Eave Boards 2x B6 Roost Bars 2x Door B8 Roost Roof Panels 2x C4 Roof Panel Egg Box C1 C2 Left and Right Side of Egg Box C3 Egg Box Door Assembly Door D1 Roost Side shorter D2 Egg Box...

Страница 5: ...A9 Header Board A7 Front Leg E4 Wire on all lower panels faces inward Wider edge on tops Wider edge on tops Wider edge on tops Run Assembly 1 Assemble Sides Pick a level place for assembly With wire...

Страница 6: ...or out as needed to allow metal pins on brackets at bottom of legs to fit into holes on bottom rail of panel Rack the entire assembly from side to side if needed to make the gap on either side of the...

Страница 7: ...edge flush Rack frame to line up edges then install E1 screws 3 and 4 Optional waterer brackets are in corners Screw 1 Screw 2 Screws 3 4 E1 brown screws into pre drilled holes Urban Coop Company all...

Страница 8: ...the nail in door frame that holds it in place during shipping Before lifting roost onto run place B8 roost roof panels to where the grooves overlap with pre drilled holes on B4 center roof support an...

Страница 9: ...clear of leg post 5 Finally screw in bottom 3 E3 roof screws screwing down into C3 egg box door top rail B2 C4 Urban Coop Company all rights reserved Storage Planter Area Fence 10 14 Set back storage...

Страница 10: ...roost panel B1 using screws in latch kits Remove nail or screw in side of door frame that holds door in place for shipping You will need to squeeze latch body together a little for holes to line up N...

Страница 11: ...t and puddling occurs nipple may have been damaged or it may be clogged with debris Clean and inspect the nipple and if you still have the problem contact us and we will get you a new nipple sent out...

Страница 12: ...ordless Drill The Run Extension replaces the removable panel A3 of your coop and becomes a rigid removable sub assembly of your coop that attaches and detaches as a unit Panel A3 gets used in your Run...

Страница 13: ...he header board Run Extension continued Run Extension continued 12b 12a Step 4 Install provided karabiner clip onto closed hasp on both sides to securely attach run extension onto your coop This allow...

Страница 14: ...he end blocks on the outside of your coop by driving 1 screw down through each mid block into frame of extension with edges flush Use the Gold T20 screws to secure ends of boards by driving 2 screws i...

Страница 15: ...r Coop 2 so that the frames are sitting back to back as illustrated in Fig 13a on next page see steps 1 3 Step 13 2 Attach Thru Panel Attach Thru panel R2 to back edges of side panels A1 of Coop 1 usi...

Страница 16: ...Shown with optional run extensions installed...

Страница 17: ...6 R2 Ranchette Run Assembly Illustration 13a R3 R3 Run Extension or Panel A3 Goes On Ends of Coop Run Extension or Panel A3 Goes On Ends A5 A5 A4 A4 A9 A9 A1 A1 A1 A1 R1 Narrower of the 2 Fill Panels...

Страница 18: ...d the P5a side board on the side of the planter that has the roost door Use the P9 gauge block to correctly space the top of the box and mount the P5 and P5a boards using 4 P4 screws in each side maki...

Отзывы: