![Uponor SETPOINT 511S Скачать руководство пользователя страница 5](http://html1.mh-extra.com/html/uponor/setpoint-511s/setpoint-511s_installation-and-operation-manual_1060935005.webp)
4. Insert the screws through the mounting holes, and fasten the base
securely to the wall. If possible, at least one of the screws should enter a
wall stud or similar surface.
5. If the controller is mounted to a 2x4 electrical box, order a Cover Plate
for the 500 Series Controllers (part number A3040007). This plate
mounts to the electrical box and the controller mounts to the plate.
Ensure that the electrical box does not provide cold air to the controller.
Note:
If the controllers are used for remote sensing (i.e., the built-in
air sensor is disabled and an indoor sensor is used), mount the
controller in the desired location.
Rough-in Wiring
Note:
18 AWG or similar wire is recommended for all 24VAC wiring.
1. Strip all wires to
1
⁄
4
" (6mm) to ensure proper connection to the control.
2. Run wires from the 24VAC power to the controller. Use a clean power
source to ensure proper operation.
3. If using an optional sensor, install the sensor according to the appropriate
instruction sheet and run two wires from the sensor to the controller.
4. Run wires from the heating and cooling device to the controller.
Wiring the Controller
Refer to the wiring examples on
pages 5, 6
and
7
to properly wire
the controller.
1. Connect the 24VAC power to the R and C terminals on the controller.
This connection provides power to the microprocessor and display of
the controller.
2. When wiring an optional sensor, connect the two wires from the sensor
to the Com and S1 terminals.
Note:
The Heat terminals are isolated outputs. There is no power available
on these terminals from the controller. Use these terminals as a
switch for a 24VAC circuit. This circuit can operate a low-current,
24VAC device directly or an external relay to enable a line-voltage
or high-current device.
Note:
The Heat 2/Cool terminals (SetPoint 512 only) are isolated outputs.
No power is available on these terminals from the controller. This
circuit can operate a low-current, 24VAC device directly or an
external relay to enable a line-voltage or high-current device.
Installing the Front Cover
1. Align the hinges on the bottom of the front
cover with the bottom of the controller
mounting base.
2. Pivot the front cover around the bottom
hinges and push the top against the
mounting base until it snaps firmly
in place. (See
Figure 3
.)
Wiring Examples for the SetPoint 511s and SetPoint 512
Refer to the figures on pages 5 - 7 to wire 24VAC power and the
optional sensors.
5
4
Section 2 — Installation
Figure 3:
Installing the Front Cover
R C Com S1 Heat
Class II
Transformer 24VAC
Heat 1
Class II
Transformer 24VAC
R C Com S1
Heat 2/
Cool
Figure 4: Wiring the SetPoint 511s
Figure 5: Wiring the SetPoint 512
Содержание SETPOINT 511S
Страница 16: ...Notes 26...