English
8
Contents
Unpacking _______________________________________________________________________________ 9
Removing the protective film and silicone cap ___________________________________________________12
Checking pack contents ____________________________________________________________________12
Getting started ___________________________________________________________________________14
Positioning _______________________________________________________________________________15
Characteristics of installation area ____________________________________________________________15
Appliance distances ________________________________________________________________________17
Positioning - COUNTERTOP OVENS _________________________________________________________18
Positioning: Floor or wheeled-bases _______________________________________________________18
Positioning:
substructures
________________________________________________________________19
$QFKRULQJRQXVHUVVXEVWUXFWXUHLHVWHHOWDEOHVHWF
________________________________________19
Anchoring to UNOX substructures ________________________________________________________19
3RVLWLRQLQJDSSOLDQFHVWDFNLQJ0D[L/,1.
__________________________________________________21
Positioning - FREE-STANDING OVENS WITH/WITHOUT TROLLEY _______________________________22
Levelling the appliance ___________________________________________________________________22
Adjustments _____________________________________________________________________________24
Door closure adjustment ___________________________________________________________________24
Electrical connection _______________________________________________________________________26
Checks
_______________________________________________________________________________27
Adapting to different voltages _____________________________________________________________27
Replacing the power supply cable __________________________________________________________27
Gas connection ___________________________________________________________________________28
Connecting to the gas utility system ________________________________________________________28
Adapting to different gas supplies __________________________________________________________28
Post-connection
checks
__________________________________________________________________31
Plumbing ________________________________________________________________________________32
Plumbing: water supply __________________________________________________________________32
Water supply: specifications_______________________________________________________________33
Plumbing: water drainage ________________________________________________________________34
Drainage:
specifications
__________________________________________________________________35
Plumbing:
interventions
__________________________________________________________________35
Smoke exhaust - ELECTRIC OVENS __________________________________________________________38
Smoke and gas exhaust - GAS OVENS _________________________________________________________39
&RQQHFWLQJVWDFNHGDSSOLDQFHV0$;,/LQN
____________________________________________________40
Connecting appliance with RJ45 cable _______________________________________________________40
6HWWLQJRYHQVDV´0$67(5µRU´&21752//('µ
____________________________________________40
Connecting the external USB interface kit and safety thermostat reset _____________________________42
INSTRUCTIONS FOR
THE INSTALLER
Содержание ChefTop XVC 2005
Страница 14: ...Getting started FREE STANDING TROLLEY OVENS 1 2 2 1 English 14...
Страница 20: ...Anchoring on UNOX substructures UNOX high open stand 1 2 x4 3 4 English 20...
Страница 25: ...2 4 5 8 10 9 11 6 7 3 OK BakerTop ChefTop English 25...
Страница 43: ...OK OK OK 2 cm 180 cm OK OK 50 cm Examples of correct and incorrect installation BakerTop ChefTop English 43...
Страница 79: ......