background image

P a g e

 | 13

 
 

 

ÜKY/DUO Boiler User Manual 

 

7. Auger: It is a spiral auger with a shaft in the middle, which provides the fuel in the bunker to be 
transferred into the furnace. The fuel feed standby settings are the helical stop and stop settings. 

8. Gearmotor: It is used with the motor. It serves to increase the power by decreasing the speed of 
the engine. The movement of the auger gives the gearmotor. 

9.  Fan:  It  is the  fan  that  provides  the  combustion  air.  It  can  be  adjusted to operate  at  the  desired 
speed from the control panel. 

10. Fan clack: It is the mechanism used to prevent air from entering when the fan stops when there is 
no burning. The metal cover inside the valve prevents the air inlet by falling automatically when the 
fan air does not draw. 

11. Heating flow line: It is the flow pipe to the radiators or heating installation. The water heated in 
the boiler is sent to the radiators or heating installation from this pipe. 

12. Heating return line: It is the pipe through which the water returned from the radiators or heating 
installation returns to the boiler. It can also be called return pipe or return line. 

13.  Safety  flow  line:  it  can  also  be  called  expansion  or  embankment  line.  It  is  the  line  where  the 
expanded water is sent as a safety due to heating in the boiler. 

14.  Safety  return  line:  It  is  the  line  where  the  water  sent  to  the  expansion  tank  is  taken  back  to 
ensure safety from the boiler. 

15. Chimney hood: It is the boiler section that discharges the poisonous gases inside the boiler with 
the flue assembly to be connected. It is the biggest factor in the good burning of the boiler. 

16.  Flue  flap:  It  is  used  to  decrease  the  traction  in  case  of  chimney  traction.  It  can  be  gradually 
dimmed. It is also used in case of accident sleeping. 

17. Hopper: It is the place where the fuel is stored. The capacity it can take depends on the fuel size. 

18. Hopper screen: It is the sieve that provides the holding of large pieces that may come out of the 
fuel  during  the  loading  of  the  bunker.  The  removal  of  the  sieve  is  inconvenient  because  the  large 
pieces of fuel fall into the bunker during fuel loading and these parts can come together to prevent 
fuel from passing through the throat on the helix. 

19.  Hopper  lid:  If  the  bunker  cover  remains  open  during  combustion,  there  may  be  a  problem  in 
boilers  that  do  not  pull  the  chimney  sufficiently.  Combustion  wastes  that  cannot  go  through  the 
chimney  can  go  through  the  shortest  route,  through  the  feeding  spiral  and  out  of  the  hopper that 
remains open. Although we call this situation, it can have dangerous consequences until the fire. 

20. Motor protection: It is a sheet made to protect people or pets from the engine and reducer. 

 

 

 

Содержание UKY/DUO 100

Страница 1: ...KY DUO Boiler User Manual NL SOY Yap Malzemeleri Sanayi ve Ticaret Ltd ti Pancar Organize Sanayi B lgesi 2 Etap No 2 Torbal ZM R Tel 444 35 32 Faks 0232 469 2412 www unmak com...

Страница 2: ...ONS 6 ELECTRICAL INSTALLATION INSTRUCTIONS 8 INFORMATION ABOUT COMBUSTION 10 BOILER FEATURES 12 RULES FOR HEATING INSTALLATION 15 CONTROL PANEL AND USER INTERFACE 19 STARTING UP 21 FUEL FEEDING STAND...

Страница 3: ...re used only for heating installations not directly for domestic water heating However it can produce hot tap water with the help of a boiler or heat exchanger The energy required for the domestic wat...

Страница 4: ...transportation rope through the forklift stands on the chassis and carrying the boiler with the help of a crane or hoist care should be taken not to damage the painted thin sheets of the boiler and t...

Страница 5: ...ble solution The door of the boiler room should not be opened directly to the escape staircase or general use staircase and must be opened to a common hall or corridor A threshold of at least 10 cm he...

Страница 6: ...dimensions The boiler room should be sized to provide the minimum dimensions given in the picture below While placing the boiler it is necessary to leave sufficient distance for the fuel to be added...

Страница 7: ...ver be used in chimney construction It should be plastered inside and outside and cylindrical pipe inserted into the rectangular chimney It should be ensured that fresh air always enters the area wher...

Страница 8: ...llation water flow rate and the boiler capacity and the 20 C difference between the boiler inlet and outlet water temperatures are not exceeded To minimize the completion of water lost in the installa...

Страница 9: ...te hot dip or c Solid copper rod should be made with electrodes Copper rod electrodes must be at least 1 5 m in diameter of 16 mm or at least 1 25 m in diameter of 20 mm and the earthing resistance of...

Страница 10: ...P a g e 9 KY DUO Boiler User Manual Control panel electrical connection diagram...

Страница 11: ...e flue to the atmosphere The material the way of construction and the connection of the chimneys are important in terms of high combustion efficiency low heating cost and protection of the environment...

Страница 12: ...el may be preferred In order to prevent condensation thermal insulation should be applied to the space between the inner and outer surfaces of the chimney At the lowest level of the chimney there must...

Страница 13: ...rs to circulate the water and circulate the smoke As the smoke passes between them it releases its energy and heats the water inside 3 Water grid They are the pipes for burning Water passes through th...

Страница 14: ...safety due to heating in the boiler 14 Safety return line It is the line where the water sent to the expansion tank is taken back to ensure safety from the boiler 15 Chimney hood It is the boiler sec...

Страница 15: ...31 33 33 35 35 40 Temperature Control Range o C 40 90 Return Temperature Recommended o C 40 Maximum Operating Pressure bar 3 Test Pressure bar 5 Dimensions Boiler Width A mm 1090 1185 1272 Depth B mm...

Страница 16: ...er to prevent the pump shaft from pressing the housing or the outer cover during operation Expansion tank In hot water heating systems when the water is heated from 10 C to 90 C its volume increases b...

Страница 17: ...boilers must be connected to an installation with an open expansion tank in accordance with the installation scheme shown below The circulation pump can be connected on the flow or return line In case...

Страница 18: ...essary measures are taken after the first filling there is no damage caused by the oxygen in the water Oxidation is mostly caused by oxygen which is involved in the heating water during operation The...

Страница 19: ...nstallation Considerations for heating connected to old installations A long term heating system produces a protective layer black magnetite on metal surfaces in contact with water When a new boiler i...

Страница 20: ...on Used to open and close the control panel button Used to input new value to the device Fan Adjustment Temperature Adjustment Fuel Feeding Fuel Standing ENTER Used to store set values and to access s...

Страница 21: ...e of the boiler is switched on and off with this button Fan On Off The fan of the boiler is switched on and off with this button Manual Fuel Feed It is used to load manual manual fuel into the boiler...

Страница 22: ...s and HEATING is not seen because the buttons are not pressed and the boiler does not work Open the boiler lower cover and hold the finger on the Manual Fuel Feed button on the control panel to allow...

Страница 23: ...r right side of the control panel will illuminate and HEAT will appear on the display If the ignition aids in the boiler ignite the fuel press the Reducer On Off button to switch on the gear unit The...

Страница 24: ...oal type can burn in an automatic combustion pot By changing the supplied feeding and waiting settings for this you can catch the most suitable burning setting for the boiler When there is no coal in...

Страница 25: ...cleaned Check that the fan is working properly Unbalanced balanced fan makes periodic noises If there are dust or ash collected between the fins of the fan it is necessary to clean it by blowing it wi...

Страница 26: ...l reservoir hopper Check that there are no holes or cracks in the chimney If you still can t consult your leg Have your chimney sealed Excessive fuel consumption Poor use of fuel may be High chimney t...

Страница 27: ...astic cover on the back of the control panel Activate the limit thermostat by pressing the red pin Turn the control panel off and on Panel over fuel warning is on Fuel in hopper The probe may be displ...

Отзывы: