ÜKY/DUO Boiler User Manual 

 

INFORMATION ABOUT COMBUSTION 

 

In order to ensure correct combustion, as a general rule, the air 

supplied  to  the  fuel must  be  at  a  certain  rate.  So  the  fan  speed 

should be adjusted well. The air required for a certain amount of 

fuel  should  not  be  too  much.  If  the  amount  of  air  which  is 

changed depending on the  type of fuel is less than the required 

amount of carbon monoxide, the energy produced is reduced, the 

combustion  starts,  the  combustion  efficiency  decreases,  the  air 

quantity is decreasing, the carbon monoxide decreases while the 

non-combustion air is heated from the chimney by heating in the 

furnace,  the  combustion  is  deteriorated  and  the  combustion 

efficiency It decreases. 

 

If the temperature of the flue gas is above the accepted values, excess energy will be ejected from 

the  flue  to  the  atmosphere.  The  material,  the  way  of  construction  and  the  connection  of  the 

chimneys are important in terms of high combustion efficiency, low heating cost and protection of 

the environment. 

 

The  chimney must  be  good  for  burning  to  be  good.  It  is  recommended to  use  a  high  temperature 

resistant firebrick and stainless steel chimneys. The horizontal smoke ducts should be connected to 

the chimney with a slope of at least 5% and the length should never exceed 1/4 of the height of the 

chimney.  The  height  of  the  chimney  should  be  well  determined.  The  chimney  sections  must  be 

circular unless necessary. 

Never use a hollow brick on the chimney walls. The most ideal is the creation of fire bricks. 

 

ÜNMAK  boilers  must  be  connected  to  an 

independent  chimney  that  can  provide  the 

minimum  desired  minimum  traction. 

Minimum  traction  is  usually  min.  It  should 

be  measured  with  a  manometer  in  20  Pa. 

The part of the waste gas line between the 

boiler and the chimney should be insulated 

with  glass  wool.  The  waste  gas  pipe  and 

Содержание UKY/DUO 100

Страница 1: ...KY DUO Boiler User Manual NL SOY Yap Malzemeleri Sanayi ve Ticaret Ltd ti Pancar Organize Sanayi B lgesi 2 Etap No 2 Torbal ZM R Tel 444 35 32 Faks 0232 469 2412 www unmak com...

Страница 2: ...ONS 6 ELECTRICAL INSTALLATION INSTRUCTIONS 8 INFORMATION ABOUT COMBUSTION 10 BOILER FEATURES 12 RULES FOR HEATING INSTALLATION 15 CONTROL PANEL AND USER INTERFACE 19 STARTING UP 21 FUEL FEEDING STAND...

Страница 3: ...re used only for heating installations not directly for domestic water heating However it can produce hot tap water with the help of a boiler or heat exchanger The energy required for the domestic wat...

Страница 4: ...transportation rope through the forklift stands on the chassis and carrying the boiler with the help of a crane or hoist care should be taken not to damage the painted thin sheets of the boiler and t...

Страница 5: ...ble solution The door of the boiler room should not be opened directly to the escape staircase or general use staircase and must be opened to a common hall or corridor A threshold of at least 10 cm he...

Страница 6: ...dimensions The boiler room should be sized to provide the minimum dimensions given in the picture below While placing the boiler it is necessary to leave sufficient distance for the fuel to be added...

Страница 7: ...ver be used in chimney construction It should be plastered inside and outside and cylindrical pipe inserted into the rectangular chimney It should be ensured that fresh air always enters the area wher...

Страница 8: ...llation water flow rate and the boiler capacity and the 20 C difference between the boiler inlet and outlet water temperatures are not exceeded To minimize the completion of water lost in the installa...

Страница 9: ...te hot dip or c Solid copper rod should be made with electrodes Copper rod electrodes must be at least 1 5 m in diameter of 16 mm or at least 1 25 m in diameter of 20 mm and the earthing resistance of...

Страница 10: ...P a g e 9 KY DUO Boiler User Manual Control panel electrical connection diagram...

Страница 11: ...e flue to the atmosphere The material the way of construction and the connection of the chimneys are important in terms of high combustion efficiency low heating cost and protection of the environment...

Страница 12: ...el may be preferred In order to prevent condensation thermal insulation should be applied to the space between the inner and outer surfaces of the chimney At the lowest level of the chimney there must...

Страница 13: ...rs to circulate the water and circulate the smoke As the smoke passes between them it releases its energy and heats the water inside 3 Water grid They are the pipes for burning Water passes through th...

Страница 14: ...safety due to heating in the boiler 14 Safety return line It is the line where the water sent to the expansion tank is taken back to ensure safety from the boiler 15 Chimney hood It is the boiler sec...

Страница 15: ...31 33 33 35 35 40 Temperature Control Range o C 40 90 Return Temperature Recommended o C 40 Maximum Operating Pressure bar 3 Test Pressure bar 5 Dimensions Boiler Width A mm 1090 1185 1272 Depth B mm...

Страница 16: ...er to prevent the pump shaft from pressing the housing or the outer cover during operation Expansion tank In hot water heating systems when the water is heated from 10 C to 90 C its volume increases b...

Страница 17: ...boilers must be connected to an installation with an open expansion tank in accordance with the installation scheme shown below The circulation pump can be connected on the flow or return line In case...

Страница 18: ...essary measures are taken after the first filling there is no damage caused by the oxygen in the water Oxidation is mostly caused by oxygen which is involved in the heating water during operation The...

Страница 19: ...nstallation Considerations for heating connected to old installations A long term heating system produces a protective layer black magnetite on metal surfaces in contact with water When a new boiler i...

Страница 20: ...on Used to open and close the control panel button Used to input new value to the device Fan Adjustment Temperature Adjustment Fuel Feeding Fuel Standing ENTER Used to store set values and to access s...

Страница 21: ...e of the boiler is switched on and off with this button Fan On Off The fan of the boiler is switched on and off with this button Manual Fuel Feed It is used to load manual manual fuel into the boiler...

Страница 22: ...s and HEATING is not seen because the buttons are not pressed and the boiler does not work Open the boiler lower cover and hold the finger on the Manual Fuel Feed button on the control panel to allow...

Страница 23: ...r right side of the control panel will illuminate and HEAT will appear on the display If the ignition aids in the boiler ignite the fuel press the Reducer On Off button to switch on the gear unit The...

Страница 24: ...oal type can burn in an automatic combustion pot By changing the supplied feeding and waiting settings for this you can catch the most suitable burning setting for the boiler When there is no coal in...

Страница 25: ...cleaned Check that the fan is working properly Unbalanced balanced fan makes periodic noises If there are dust or ash collected between the fins of the fan it is necessary to clean it by blowing it wi...

Страница 26: ...l reservoir hopper Check that there are no holes or cracks in the chimney If you still can t consult your leg Have your chimney sealed Excessive fuel consumption Poor use of fuel may be High chimney t...

Страница 27: ...astic cover on the back of the control panel Activate the limit thermostat by pressing the red pin Turn the control panel off and on Panel over fuel warning is on Fuel in hopper The probe may be displ...

Отзывы: