24
MOBILE
HOME
INSTALLATION
Mobile
home
installation
should
be
done
in
accordance
with
the
Manufactured
Home
and
Safety
Standard
(HUD),
CFR
3280,
Part
24.
Canadian
installations
require
that
the
heater
must
be
connected
to
a
3
or
4
inch,
factory
‐
built
chimney
conforming
to
CAN/ULC
‐
S629.
See
the
installation
illustrations
in
this
manual
for
minimum
height
above
the
roof.
U.S.
Stove
suggests
the
use
of
Selkirk’s
Pellet
Venting
Products.
Refer
to
their
installation
instructions
for
proper
installation
of
the
exhaust
and
combustion
air
intake.
The
chimney
installation
must
allow
for
removal
in
case
of
mobile
home
transportation,
especially
outside
connections.
You
may
contact
your
local
building
authority
or
person
having
jurisdiction
on
height
restrictions.
In
order
for
this
unit
to
be
installed
in
a
mobile
home
the
following
criteria
must
be
met:
The
unit
must
be
secured
to
the
floor
using
lag
bolts
in
the
holes
provided
in
the
pedestal
base.
Ensure
that
the
unit
is
permanently
electrically
grounded
to
the
chassis
of
your
home.
IT
IS
MANDATORY
TO
TAKE
THE
COMBUSTION
AIR
FROM
THE
OUTSIDE
WHEN
INSTALLING
THIS
UNIT
IN
AIR
TIGHT
OR
MANUFACTURED/MOBILE
HOMES.
CAUTION:
THE
STRUCTURAL
INTEGRITY
OF
THE
MANUFACTURED
HOME
FLOOR,
WALL,
AND
CEILING/ROOF
MUST
BE
MAINTIANED.
MAKE
SURE
TO
MAINTAIN
AN
EFFECTIVE
VAPOR
BARRIER
BY
SEALING
WITH
SILICONE
WHERE
THE
CHIMNEY
OR
OTHER
COMPONENTS
PENETRATE
TO
THE
EXTERIOR
OF
THE
STRUCTURE.
REFER
TO
AND
FOLLOW
THE
CHIMNEY
MANUFACTURER’S
INSTALLATION
INSTRCUTIONS.
WARNING:
DO
NOT
INSTALL
IN
SLEEPING
ROOM.
NOTE:
Only
the
freestanding
model
is
for
installation
into
a
mobile
home.
Содержание PELLET 5660(I)
Страница 16: ...16 INSTALLING YOUR ROOM HEATER continued HORIZONTAL EXHAUST VENT INSTALLATION...
Страница 19: ...19...
Страница 29: ...29 VENT TERMINATION LOCATIONS Figure 22...
Страница 37: ...37 WIRING DIAGRAM...
Страница 40: ...40...