background image

14

 

 

INSTALLING

 

YOUR

 

ROOM

 

HEATER

 

 
 

You

 

have

 

already

 

made

 

the

 

important

 

decision

 

of

 

choosing

 

your

 

U.S.

 

Stove

 

Pellet

 

Burning

 

Room

 

Heater;

 

now

 

your

 

next

 

step

 

is

 

to

 

determine

 

where

 

to

 

install

 

your

 

new

 

pellet

 

stove

 

heater.

 

To

 

get

 

the

 

most

 

efficient

 

use

 

of

 

re

circulated

 

heat,

 

you

 

should

 

consider

 

a

 

room

 

that

 

is

 

centrally

 

located

 

within

 

your

 

home.

  

Choose

 

a

 

room

 

that

 

is

 

large

 

and

 

open.

 

 

It

 

is

 

Extremely

 

Important

 

to

 

maintain

 

proper

 

clearances

 

from

 

any

 

combustible

 

surfaces

 

or

 

materials

 

in

 

the

 

room

 

where

 

your

 

heater

 

will

 

be

 

located.

  

You

 

can

 

find

 

proper

 

clearance

 

measurements

 

on

 

page

 

13

 

of

 

this

 

manual

 

and

 

on

 

the

 

rating

 

label

 

of

 

your

 

pellet

 

stove.

 

 

The

 

pellet

 

stove

 

can

 

be

 

vented

 

through

 

an

 

exterior

 

wall

 

or

 

into

 

an

 

existing

 

masonry

 

or

 

metal

 

chimney.

 

The

 

chimney

 

must

 

be

 

lined

 

if

 

it

 

is

 

over

 

6”

 

(150mm)

 

in

 

diameter

 

or

 

if

 

it

 

has

 

a

 

cross

sectional

 

area

 

of

 

over

 

28

 

square

 

inches

 

(711mm

2

).

 

Venting

 

can

 

pass

 

through

 

the

 

ceiling

 

and

 

roof

 

if

 

approved

 

pipe

 

is

 

used.

 

Where

 

passage

 

through

 

a

 

wall,

 

or

 

partition

 

of

 

combustible

 

construction

 

is

 

desired,

 

the

 

installation

 

must

 

conform

 

to

 

CAN/CSA

B365

 

 

DO

 

NOT

 

OBTAIN

 

COMBUSTION

 

AIR

 

FROM

 

THE

 

ATTIC,

 

GARAGE

 

OR

 

ANY

 

OTHER

 

UNVENTILATED

 

AREA.

 

YOU

 

MAY

 

OBTAIN

 

COMBUSTION

 

AIR

 

FROM

 

A

 

VENTILATED

 

CRAWLSPACE.

 

 

DO

 

NOT

 

INSTALL

 

A

 

FLUE

 

DAMPER

 

IN

 

THE

 

EXHAUST

 

VENTING

 

SYSTEM

 

OF

 

THIS

 

UNIT.

 

 

DO

 

NOT

 

CONNECT

 

THIS

 

UNIT

 

TO

 

A

 

CHIMNEY

 

FLUE

 

SERVING

 

ANOTHER

 

HEATER,

 

FURNACE

 

OR

 

APPLIANCE.

 

 

INSTALL

 

VENT

 

AT

 

CLEARANCES

 

SPECIFIED

 

BY

 

THE

 

VENT

 

MANUFACTURER.

 

 

ONLY

 

USE

 

APPROVED

 

MATERIAL

 

FOR

 

INSTALLATION,

 

FAILURE

 

TO

 

DO

 

SO

 

MAY

 

RESULT

 

IN

 

PROPERTY

 

DAMAGE,

 

BODILY

 

INJURY,

 

OR

 

EVEN

 

DEATH.

 

 

This

 

appliance

 

is

 

certified

 

for

 

use

 

with

 

listed

 

3

 

inch

 

or

 

4

 

inch

 

“PL”

 

or

 

“L”

 

pellet

 

venting

 

products

 

as

 

well

 

as

 

Selkirk’s

 

Direct

Temp

 

Vent

 

system

 

for

 

pellet

 

burning

 

appliances.

   

The

 

use

 

of

 

other

 

components

 

other

 

than

 

stated

 

herein

 

could

 

cause

 

bodily

 

harm,

 

heater

 

damage,

 

and

 

void

 

your

 

warranty.

 

Содержание PELLET 5660(I)

Страница 1: ...may result For everyone s safety FOLLOW all Installation and Operating Directions Never use makeshift compromises during the installation of this appliance Contact your local building or fire official...

Страница 2: ...ting Instructions 8 11 Thermostat Installation 12 Clearances to Combustibles 13 Installing Your Room Heater 14 23 Mobile Home Installations 24 Insert Pellet Stove Installation 25 28 Vent Termination L...

Страница 3: ...meter by 1 1 2 length Ash Content 1 Maximum Premium grade 3 Maximum Standard grade Moisture Content 8 Maximum Heat Content Minimum 8 200 btu s per hour It is important to note that the ash content of...

Страница 4: ...e is maintained Make sure that structural integrity of the home is maintained when passing vent pipes through walls ceilings and roofs It is recommended that the exhaust vent be cleaned bi annually or...

Страница 5: ...ower outages with battery backup or room air starvation occurs during operation of heater smoke in the house may result This may trigger smoke detectors if they are installed CAUTION DO NOT CONNECT TO...

Страница 6: ...6 SPECIFICATIONS Heating Specifications Burn Rate 43 900 btu s per hour or 5 1 lbs of fuel per hour Hopper Capacity 55 lbs Dependent upon quality and heating value of pellet fuel DIMENSIONS Figure 1...

Страница 7: ...7 DIMENSIONS continued The minimum installation dimensions of the insert opening are 32 813mm wide x 22 3 4 578mm high x 12 1 4 311mm deep Figure 2...

Страница 8: ...d you will feel the latch engage and hear an audible click When first operating your Pellet Stove depress the MODE button until the LED indicator above MANUAL lights up This will engage MANUAL mode an...

Страница 9: ...u desire to operate the circulation fan at its maximum setting regardless of heat setting you may do so by pressing the FAN button Auger Trim When operating at Heat Level 1 if the flame goes out or th...

Страница 10: ...will end this takes between 8 12 minutes At this point the LED indicator light above the ON OFF button will glow solid green The user will now be able to make heat level adjustments HEAT LEVEL Button...

Страница 11: ...t accidental injury KEEP PELLET FUEL HOPPER LID CLOSED AT ALL TIMES EXCEPT WHEN REFILLING DO NOT OVERFILL HOPPER Safety Features and warning code 1 Your heater is equipped with a temperature high limi...

Страница 12: ...wires and connect to the screw terminal on the rear of the control panel see Figure 4 If you have installed a remote thermostat for your pellet stove and wish to have the heater controlled by that the...

Страница 13: ...stalled on a combustible floor it is mandatory that a 1 2 13mm thick non combustible hearth pad be installed under the heater The non combustible hearth pad must extend at least 6 beyond the fuel load...

Страница 14: ...sectional area of over 28 square inches 711mm2 Venting can pass through the ceiling and roof if approved pipe is used Where passage through a wall or partition of combustible construction is desired t...

Страница 15: ...ir vent has an approved cap on it to prevent rodents from entering Be sure to install in location that won t become blocked with snow etc 8 The air intake pipe is equipped with a butterfly valve that...

Страница 16: ...16 INSTALLING YOUR ROOM HEATER continued HORIZONTAL EXHAUST VENT INSTALLATION...

Страница 17: ...r of the combustion air intake pipe at the back of your unit Line up the center with the same spot on your exterior wall and cut a 2 1 2 64mm diameter hole through the wall 5 Secure all vent joint con...

Страница 18: ...the wall 5 Secure all vent joint connections with 3 screws Seal the exhaust vent joint connections with high temperature silicone sealant 6 Locate the center of the exhaust pipe at the back of the un...

Страница 19: ...19...

Страница 20: ...20 INSTALLING YOUR ROOM HEATER continued SELKIRK DIRECT TEMP VENT SYSTEM FOR PELLET STOVE HEATERS Images courtesy of Selkirk...

Страница 21: ...21 INSTALLING YOUR ROOM HEATER continued SELKIRK DIRECT TEMP VENT SYSTEM FOR PELLET STOVE HEATERS Images courtesy of Selkirk UP OUT HORIZONTAL TERMINATION KIT Figure 12...

Страница 22: ...22 INSTALLING YOUR ROOM HEATER continued SELKIRK DIRECT TEMP VENT SYSTEM FOR PELLET STOVE HEATERS Images courtesy of Selkirk STRAIGHT OUT HORIZONTAL TERMINATION KIT Figure 13...

Страница 23: ...23 INSTALLING YOUR ROOM HEATER continued SELKIRK DIRECT TEMP VENT SYSTEM FOR PELLET STOVE HEATERS Images courtesy of Selkirk THROUGH THE ROOF VERTICAL TERMINATION KIT Figure 14...

Страница 24: ...r person having jurisdiction on height restrictions In order for this unit to be installed in a mobile home the following criteria must be met The unit must be secured to the floor using lag bolts in...

Страница 25: ...of the fireplace There is a small amount of assembly required when installing this model The steps are as follows Note The shroud must be installed before unit is set into its final position Step 1 S...

Страница 26: ...k of the unit take the top shroud side piece and fasten as shown with 4 screws provided Step 4 Control Board Take the control board and insert it from the back of the right shroud side facing front of...

Страница 27: ...a k factor of 0 84 For multiple layers add R values of each layer to determine the overall R value The R value for the required board is 1 2 Convert specification to R value k factor is given with a r...

Страница 28: ...e adapter to the exhaust fan and either a 90 elbow or a clean out tee with cap The air intake can be attached to the heater with a hose clamp 6 Connect the heater to the coupling on the bottom of the...

Страница 29: ...29 VENT TERMINATION LOCATIONS Figure 22...

Страница 30: ...ol to room temperature before inspecting the burn pot Inspect the burn pot regularly to check that the holes have not become plugged If necessary clean thoroughly It is imperative that the burn pot be...

Страница 31: ...r vacuum cleaner should have a special filter or bag to eliminate leakage 5 Remove ash pan and dispose of ashes into metal container 6 Reinstall ash pan 7 Reinstall burn pot and burn pot liner Ash Rem...

Страница 32: ...on the blades of the circulation exhaust fans The fans should be inspected periodically and if any accumulation is present vacuumed clean as the ash or dust can impede the fans performance It is also...

Страница 33: ...ermine if cleaning is necessary Door Gaskets Gaskets around the door and window panes should be inspected cleaned and repaired when necessary to maintain good seal Door Glass Removal and Replacement D...

Страница 34: ...r local dealer for service Check the vacuum switch by shorting out the vacuum switch then depress ON OFF button to OFF and back to ON If the unit starts to operate change the vacuum switch Check the e...

Страница 35: ...ns If the auger motor starts to function normally replace the high limit switch If the auger is not jammed and you have tried the other possible causes connect 120 volts directly to the auger motor If...

Страница 36: ...runs constantly there is a problem with the circuit board Combustion blower is not operating Check the exhaust blower is operating if not bypass the exhaust temperature switch if the motor operates r...

Страница 37: ...37 WIRING DIAGRAM...

Страница 38: ...y 1 Microlite Glass ROBAX 5mm thick 2 High Temp Paint STOVE BRIGHT Aerosol can or brush bottle 3 Exhaust Blower J238 AC 115V 60HZ 1 5A 4 Circulation Blower F33HA AC 120V 60HZ 1 4A 5 Auger Motor 6120A1...

Страница 39: ...made under the terms of this warranty are warranted only for the remaining period of the original heater warranty 4 Without specific written exclusionary waivers no one has authority to add to or var...

Страница 40: ...40...

Отзывы: