
15
INSTALLING
YOUR
ROOM
HEATER
‐
continued
HORIZONTAL
EXHAUST
VENT
INSTALLATION
1.
Locate
your
pellet
stove
in
a
location
which
meets
the
requirements
of
this
manual,
but
in
an
area
where
it
does
not
interfere
with
the
house
framing,
wiring,
etc.
2.
Install
a
non
‐
combustible
hearth
pad
underneath
the
pellet
stove.
This
pad
should
extend
at
least
6”
(152mm)
in
front
of
the
unit.
3.
Place
the
pellet
stove
approximately
15”
(381mm)
away
from
the
interior
wall.
4.
Locate
the
center
of
the
exhaust
pipe
of
your
unit.
This
point
should
then
be
extended
to
the
interior
wall
of
your
house.
Once
you
have
located
the
center
point,
on
the
interior
wall,
cut
a
7”
(175mm)
diameter
hole
through
the
wall.
5.
The
next
step
is
to
install
the
wall
thimble,
refer
to
the
instructions
which
come
with
the
wall
thimble
for
this
step.
6.
Install
the
appropriate
length
of
exhaust
vent
pipe
into
the
wall
thimble.
See
step
11
when
determining
the
correct
length
of
exhaust
vent
to
use.
7.
Outside
Fresh
Air
is
Mandatory
when
installing
this
pellet
stove
room
heater
in
airtight
homes
and
mobile
homes.
Be
sure
that
the
outside
air
vent
has
an
approved
cap
on
it
to
prevent
rodents
from
entering.
Be
sure
to
install
in
location
that
won’t
become
blocked
with
snow,
etc.
8.
The
air
intake
pipe
is
equipped
with
a
butterfly
valve
that
is
preset
to
maximum
air
intake.
For
optimum
operating
efficiency
you
may
calibrate
the
butterfly
valve
to
provide
less
intake
air.
(See
Figure
7)
Caution:
Too
much
restriction
on
the
intake
air
will
cause
dirtier
burn,
therefore,
will
require
more
frequent
cleaning.
9.
Connect
the
exhaust
vent
pipe
to
the
exhaust
outlet
of
your
pellet
stove.
10.
Secure
all
vent
joint
connections
with
3
screws.
Seal
the
exhaust
vent
joint
connections
with
high
temperature
silicone
sealant.
11.
Push
the
unit
straight
back
to
the
interior
wall,
being
sure
to
maintain
the
minimum
clearances
to
combustibles
6”
(152mm)
to
the
back
of
the
unit.
Seal
the
annular
space
of
the
wall
thimble
and
around
the
vent
pipe
with
high
temperature
silicone
sealant.
12.
The
exhaust
vent
pipe
must
extend
at
least
12”
(300mm)
out
past
the
exterior
wall.
Seal
the
annular
space
of
the
wall
thimble
and
around
the
vent
pipe
with
high
temperature
silicone
sealant.
13.
Install
an
approved
horizontal
termination
cap
or
if
necessary
install
a
90°
elbow
and
appropriate
length
of
vertical
venting.
An
approved
vertical
vent
cap
is
recommended.
Содержание PELLET 5660(I)
Страница 16: ...16 INSTALLING YOUR ROOM HEATER continued HORIZONTAL EXHAUST VENT INSTALLATION...
Страница 19: ...19...
Страница 29: ...29 VENT TERMINATION LOCATIONS Figure 22...
Страница 37: ...37 WIRING DIAGRAM...
Страница 40: ...40...