background image

16

 

INSTALLING

 

YOUR

 

ROOM

 

HEATER

 

‐ 

continued

 

HORIZONTAL

 

EXHAUST

 

VENT

 

INSTALLATION

 

 

 

Содержание PELLET 5660(I)

Страница 1: ...may result For everyone s safety FOLLOW all Installation and Operating Directions Never use makeshift compromises during the installation of this appliance Contact your local building or fire official...

Страница 2: ...ting Instructions 8 11 Thermostat Installation 12 Clearances to Combustibles 13 Installing Your Room Heater 14 23 Mobile Home Installations 24 Insert Pellet Stove Installation 25 28 Vent Termination L...

Страница 3: ...meter by 1 1 2 length Ash Content 1 Maximum Premium grade 3 Maximum Standard grade Moisture Content 8 Maximum Heat Content Minimum 8 200 btu s per hour It is important to note that the ash content of...

Страница 4: ...e is maintained Make sure that structural integrity of the home is maintained when passing vent pipes through walls ceilings and roofs It is recommended that the exhaust vent be cleaned bi annually or...

Страница 5: ...ower outages with battery backup or room air starvation occurs during operation of heater smoke in the house may result This may trigger smoke detectors if they are installed CAUTION DO NOT CONNECT TO...

Страница 6: ...6 SPECIFICATIONS Heating Specifications Burn Rate 43 900 btu s per hour or 5 1 lbs of fuel per hour Hopper Capacity 55 lbs Dependent upon quality and heating value of pellet fuel DIMENSIONS Figure 1...

Страница 7: ...7 DIMENSIONS continued The minimum installation dimensions of the insert opening are 32 813mm wide x 22 3 4 578mm high x 12 1 4 311mm deep Figure 2...

Страница 8: ...d you will feel the latch engage and hear an audible click When first operating your Pellet Stove depress the MODE button until the LED indicator above MANUAL lights up This will engage MANUAL mode an...

Страница 9: ...u desire to operate the circulation fan at its maximum setting regardless of heat setting you may do so by pressing the FAN button Auger Trim When operating at Heat Level 1 if the flame goes out or th...

Страница 10: ...will end this takes between 8 12 minutes At this point the LED indicator light above the ON OFF button will glow solid green The user will now be able to make heat level adjustments HEAT LEVEL Button...

Страница 11: ...t accidental injury KEEP PELLET FUEL HOPPER LID CLOSED AT ALL TIMES EXCEPT WHEN REFILLING DO NOT OVERFILL HOPPER Safety Features and warning code 1 Your heater is equipped with a temperature high limi...

Страница 12: ...wires and connect to the screw terminal on the rear of the control panel see Figure 4 If you have installed a remote thermostat for your pellet stove and wish to have the heater controlled by that the...

Страница 13: ...stalled on a combustible floor it is mandatory that a 1 2 13mm thick non combustible hearth pad be installed under the heater The non combustible hearth pad must extend at least 6 beyond the fuel load...

Страница 14: ...sectional area of over 28 square inches 711mm2 Venting can pass through the ceiling and roof if approved pipe is used Where passage through a wall or partition of combustible construction is desired t...

Страница 15: ...ir vent has an approved cap on it to prevent rodents from entering Be sure to install in location that won t become blocked with snow etc 8 The air intake pipe is equipped with a butterfly valve that...

Страница 16: ...16 INSTALLING YOUR ROOM HEATER continued HORIZONTAL EXHAUST VENT INSTALLATION...

Страница 17: ...r of the combustion air intake pipe at the back of your unit Line up the center with the same spot on your exterior wall and cut a 2 1 2 64mm diameter hole through the wall 5 Secure all vent joint con...

Страница 18: ...the wall 5 Secure all vent joint connections with 3 screws Seal the exhaust vent joint connections with high temperature silicone sealant 6 Locate the center of the exhaust pipe at the back of the un...

Страница 19: ...19...

Страница 20: ...20 INSTALLING YOUR ROOM HEATER continued SELKIRK DIRECT TEMP VENT SYSTEM FOR PELLET STOVE HEATERS Images courtesy of Selkirk...

Страница 21: ...21 INSTALLING YOUR ROOM HEATER continued SELKIRK DIRECT TEMP VENT SYSTEM FOR PELLET STOVE HEATERS Images courtesy of Selkirk UP OUT HORIZONTAL TERMINATION KIT Figure 12...

Страница 22: ...22 INSTALLING YOUR ROOM HEATER continued SELKIRK DIRECT TEMP VENT SYSTEM FOR PELLET STOVE HEATERS Images courtesy of Selkirk STRAIGHT OUT HORIZONTAL TERMINATION KIT Figure 13...

Страница 23: ...23 INSTALLING YOUR ROOM HEATER continued SELKIRK DIRECT TEMP VENT SYSTEM FOR PELLET STOVE HEATERS Images courtesy of Selkirk THROUGH THE ROOF VERTICAL TERMINATION KIT Figure 14...

Страница 24: ...r person having jurisdiction on height restrictions In order for this unit to be installed in a mobile home the following criteria must be met The unit must be secured to the floor using lag bolts in...

Страница 25: ...of the fireplace There is a small amount of assembly required when installing this model The steps are as follows Note The shroud must be installed before unit is set into its final position Step 1 S...

Страница 26: ...k of the unit take the top shroud side piece and fasten as shown with 4 screws provided Step 4 Control Board Take the control board and insert it from the back of the right shroud side facing front of...

Страница 27: ...a k factor of 0 84 For multiple layers add R values of each layer to determine the overall R value The R value for the required board is 1 2 Convert specification to R value k factor is given with a r...

Страница 28: ...e adapter to the exhaust fan and either a 90 elbow or a clean out tee with cap The air intake can be attached to the heater with a hose clamp 6 Connect the heater to the coupling on the bottom of the...

Страница 29: ...29 VENT TERMINATION LOCATIONS Figure 22...

Страница 30: ...ol to room temperature before inspecting the burn pot Inspect the burn pot regularly to check that the holes have not become plugged If necessary clean thoroughly It is imperative that the burn pot be...

Страница 31: ...r vacuum cleaner should have a special filter or bag to eliminate leakage 5 Remove ash pan and dispose of ashes into metal container 6 Reinstall ash pan 7 Reinstall burn pot and burn pot liner Ash Rem...

Страница 32: ...on the blades of the circulation exhaust fans The fans should be inspected periodically and if any accumulation is present vacuumed clean as the ash or dust can impede the fans performance It is also...

Страница 33: ...ermine if cleaning is necessary Door Gaskets Gaskets around the door and window panes should be inspected cleaned and repaired when necessary to maintain good seal Door Glass Removal and Replacement D...

Страница 34: ...r local dealer for service Check the vacuum switch by shorting out the vacuum switch then depress ON OFF button to OFF and back to ON If the unit starts to operate change the vacuum switch Check the e...

Страница 35: ...ns If the auger motor starts to function normally replace the high limit switch If the auger is not jammed and you have tried the other possible causes connect 120 volts directly to the auger motor If...

Страница 36: ...runs constantly there is a problem with the circuit board Combustion blower is not operating Check the exhaust blower is operating if not bypass the exhaust temperature switch if the motor operates r...

Страница 37: ...37 WIRING DIAGRAM...

Страница 38: ...y 1 Microlite Glass ROBAX 5mm thick 2 High Temp Paint STOVE BRIGHT Aerosol can or brush bottle 3 Exhaust Blower J238 AC 115V 60HZ 1 5A 4 Circulation Blower F33HA AC 120V 60HZ 1 4A 5 Auger Motor 6120A1...

Страница 39: ...made under the terms of this warranty are warranted only for the remaining period of the original heater warranty 4 Without specific written exclusionary waivers no one has authority to add to or var...

Страница 40: ...40...

Отзывы: