Run Data.xlsm
E
T
– Total Particulate Emissions, g
ASTM E2515 equation (15)
Where:
C
s
=
Concentration of particulate matter in tunnel gas, g/dscf
C
r
=
Concentration particulate matter room air, g/dscf
Q
std
=
Average dilution tunnel gas flow rate, dscf/hr
θ
=
Total time of test run, minutes
Sample calculation:
For Train A
E
T
= ( 0.000049 -
0.000000 ) x
20540.0
x
360 /60
E
T
=
5.98
g
For Train B
E
T
= ( 0.000050 -
0.000000 ) x
20540.0
x
360
/60
E
T
=
6.20
g
Average
E =
6.09
g
Total emission values shall not differ by more than 7.5% from the total average emissions
7.5% of the average =
0.46
Train A difference (%) =
1.8%
Train B difference (%)=
1.8%
(
)
−
=
std
r
s
T
Q
c
c
E
PFS-TECO
Page 11 of 18
Содержание SP1000E
Страница 2: ...Project 23 114 Model SP1000E Page 2 Revision History 6 14 2023 Original Issue...
Страница 11: ...Project 23 114 Model SP1000E Page 11 Appliance Front Appliance Left...
Страница 12: ...Project 23 114 Model SP1000E Page 12 Appliance Right Appliance Rear...
Страница 14: ...Project 23 114 Model SP1000E Page 14 Pellet Fuel Analysis...
Страница 17: ...Project 23 114 Model SP1000E Page 17 Sealed Unit...
Страница 60: ......
Страница 61: ......
Страница 62: ......
Страница 110: ...24 2023 Breckwell REPLACEMENT PARTS 1 2 3 4 5 6 7 8 9 10 11 12 13 27 14 15 16 17 18 19 20 21 32 22 23 24 29 28 30 26 25...
Страница 113: ...2023 Breckwell 27 ITEMS DEFINED...
Страница 181: ......
Страница 182: ......
Страница 183: ......
Страница 184: ......
Страница 185: ......
Страница 186: ......
Страница 187: ......
Страница 188: ......