Secure the fan center to the junction box using the two
(2) provided screws as shown.
DRAFT BLOWER
Secure the draft blower to the back upper left-hand side
of the unit using the four (4) provided 10-24 kep nuts.
HONEYWELL PROBE
Install the Honeywell probe into the ducktwork above the
unit. NOTE: The conduit is supplied at a predetermined
length of approximately 3 feet
FILTER BOX
The filter box is made up of 4 parts, plus all hardware
necessary for assembly.
Assemble the filter box sides, top, and bottom using
twenty (20) #10 A x 1/2 HX screws.
If your BX Cables will not match up to the previously
matched arrangement on the top, carefully measure
and custom notch to accommodate your particular
arrangement of BX Cables. There are several different
configurations.
Secure the filter box to the unit using a total of ten (10)
#10 A x 1/2 HX screws, five (5) on each side.
ASSEMBLY INSTRUCTIONS
Содержание Hot Blast HB1520
Страница 22: ...22 2023 United States Stove Company ELECTRICAL INSTALLATION...
Страница 26: ...26 2023 United States Stove Company NOTES...
Страница 27: ...2023 United States Stove Company 27 NOTES...