Electrical connections 

●  Sensor Electrodes:  –  Coaxial Cable Shield: from the evaluation unit X3/2 to the opposite elec-

trode "B". 

 

 

–  Coaxial  Cable  Core: from  the  evaluation  unit  X3/1  to  the measurement  

electrode "A". 

●  Evaluation unit: 

–  Connect X1/1 and X1/2 to the power supply (24V AC / DC). 

The polarity ± doesn’t matter. 

 

 

– 

Connect X1/3 to the earth of mounting structure "C" using a separate 
cable.

 

No  additional  connection  to  the  earth  potential  is  admitted  from 
here! X1/3 is not used for safety grounding, but exclusively for ref-
erence potential at the sensor electrodes.

 

 

 

–  Connect X2 (relay contacts) to the higher-level control system according 

to their function. 

 

 

–  Connect X3/1 to the sensor electrode "A" through the internal conductor 

of the coaxial cable. 

 

 

–  Connect X3/2 to the opposite electrode "B" through the shield of the co-

axial cable. 

 

4

 

Installation 

1.:  Produce and install the sensor electrodes as described in chapter "2.2 Sensor Electrodes". 

2.:  Place Electrodes and evaluation unit as close as possible. Connection cables may not exceed 

100cm. 

3.:  Check and make sure that there is 

NO

 

–  short circuit between the electrodes, 

 

–  electrical connection between measuring or opposite electrodes and mounting structure. 

 

–  electrical connection to the machine ground. 

4.:  Connect the coaxial cable to the sensor electrodes. The core goes to the measurement elec-

trode and the shield to the opposite one. 

5.:  Connect the reference potential of the evaluation unit X1/3 direct to the earthed mounting struc-

ture. 

6.:  Connect the supply voltage (24VAC / DC) to the evaluation unit (X1/1, X1/2). 

7.:  First operation 
 

By the first operation an adjustment must be made. The state of the detect area will be evaluated 
and saved as a reference. 

 

!

 

The detection area must be free to process adjustment! No working pieces, stored objects or 
people may stay around, since they influence the adjustment signal. 

 

a)

 

Switch on the evaluation unit

. The green LED6 must light up. 

 

b)

 

Carry out adjustment

 

The adjustment behavior of the evaluation unit depends on the switch SW2-2 settings: 

 

 

SW2-2 OFF After first switching ON, the evaluation unit starts an automatic adjustment. 

 

 

SW2-2 ON  The 

adjustment is not

 

automatically 

carried out. Adjustment must be forced 

by pressing the SW1 button for at least 5s. 
The elapsed time can be seen on the behavior of LED2: After 2s, LED2 lights 
UP and after 5s it goes OFF again. The adjustment process starts shortly. The 
button SW1 can now be released. 

With SW2-2 = ON, the operating parameters from the last application still 
apply.  This  can  lead  the  unit  changing  to  the  error  state.  The  red  LED4 
then indicates this state by permanently lighting.

 

 

 

– The red LED4 blinks during the adjustment process. 

 

 

– The adjustment process has been successfully completed when LED1 blinks (1 / s). 

 

 

– If no working point is found during the adjustment, the evaluation unit changes to the error 

state. This is indicated by the constant lighting of the red LED4. 

8.:  Place the working object in the sensing area. 

Содержание S-SW-8

Страница 1: ...manual adjustment switch SW2 2 to OFF 6 2 4 2 Sensitivity setting relay switching point 6 2 5 Technical Data 7 3 Montage Cabling 8 3 1 System arrangement 8 3 2 Electrical connections 9 4 Installation...

Страница 2: ...the sensitivity is set appropriately the presence of the new objects is detected A potential free contact relay turns ON OFF according to the IN OUT movement of objects over the sensing area the swit...

Страница 3: ...Connections Con nector Pin Connection X1 1 24 VAC DC Supply Voltage Both polarity accepted 2 3 PE Reference Potential Connected to the earth X2 1 C Relay common contact 2 NO Relay normally open contac...

Страница 4: ...of the evaluation unit via the shield of the coaxial cable Montage structure C The design of the mounting structure depends on the conditions at the installation place It must be made of conductive ma...

Страница 5: ...switch on point occupied and the switch off point free for the relay The sensor signal level for the switch ON point is stronger than the switch OFF point A larger hysteresis means that the switch ON...

Страница 6: ...ves the reference value of the system The sensor electrodes must be free when performing a new adjustment No objects or person may be near the sensor electrodes SW2 2 OFF Memory OFF After power ON the...

Страница 7: ...n 2 5 Technical Data Parameter Sim Condition min tip max Unit Supply Voltage UV AC DC 18 24 30 V Operation Power IV 18V UV 30V 3 W Environment Tempera ture TF In operation 15 20 55 C TL Storage 20 60...

Страница 8: ...ts to be detected This ensures safe switching behavior The evaluation unit should be installed near the sensor electrodes The sensor line coaxial cable between the evaluation unit and sensor electrode...

Страница 9: ...e 5 Connect the reference potential of the evaluation unit X1 3 direct to the earthed mounting struc ture 6 Connect the supply voltage 24VAC DC to the evaluation unit X1 1 X1 2 7 First operation By th...

Страница 10: ...timum sensitivity for the working object is set LED2 confirms the process by flashing briefly 2 Manual Relay OFF LED5 OFF Rotate the switch SW1 clock wise until the relay switches ON plus three more p...

Отзывы: