There are two possible configuration methods: 

1.

 

Automatic:

  Pressing the SW1 button for 2s… 3s when the LED2 lights up. 

With a small time delay, the unit adjusts the sensitivity to match the object in the 
detection area. If the relay was previously switched OFF, it now switches ON. Case 
the relay was already ON, it stays ON until the object is removed from the detection 
area. 

2.

 

Manual:

 

● 

If the relay is OFF

 (LED5 is OFF) 

Rotate switch SW1 clock-wise until the relay switches ON, then go three points 
further. 

   

● 

If the relay is already ON

 (LED5 ON) 

Rotate  switch  SW1  anti-clock-wise  until  the  relay  switches  OFF  (LED5  OFF). 
Then return until the relay switches ON again (LED5 ON) plus three points. 

If necessary, the sensitivity can be adjusted manually at any time by turning the switch SW1. The 
sensitivity setting is saved and valid even after unit power down. 
 

2.5

 

Technical Data 

Parameter

 

Sim

 

Condition

 

min

 

tip

 

max

 

Unit

 

Supply Voltage 

U

V

 

AC/DC 

18 

24 

30 

Operation Power 

I

V

 

18V ≤ U

V

 ≤ 30V 

 

 

Environment Tempera-
ture 

T

F

 

In operation 

-15 

+20 

+55 

°C 

T

L

 

Storage 

-20 

 

+60 

°C 

Switching point hysteresis 

 

SW2-1 = OFF 

 

 

SW2-1 = ON 

 

10 

 

Conductor cross-section 

Ø 

X1 
X2 
X3 
solid 
or 
flexible 

Without termina-
tion 

0,2 

 

2,5 

mm

2

 

24 

 

12 

AWG 

Termination with 
cap 

0,25 

 

1,5 

mm

2

 

Termination 
without cap 

0,25 

 

2,5 

mm

2

 

Isolation length 

 

X1, X2, X3 

 

10 

mm 

Relay contact 

 

Voltage 

 

250 

300 

VAC 

 

24 

250 

VDC 

Current (external protected) 

 

 

10 

Contact resistance 

 

 

0,1 

Ω 

Case 

Length 

 

160 

 

mm 

Wide 

 

80 

 

mm 

High 

 

55 

 

mm 

 

Material 

Poly-carbonate 

 

Protection level 

IP65 / DIN 40050 

 

Color 

RAL 7035 

 

Con-

nectors

 

Pin

 

Connection

 

X1 

24V

AC/DC 

  Supply voltage 

The polarity is interchanged. 

 

 

PE 

Earth potential 

Connected  to  the  mounting  structure  of  the 
sensor electrodes. 

X2 

Relay common contact 

 

NO 

Relay normally open contact 

 

NC 

Relay normally closed contact 

X3 

Core 

On measurement electrode connected 

Coaxial cable 

 

Shield 

On the opposite electrode connected 

 

Содержание S-SW-8

Страница 1: ...manual adjustment switch SW2 2 to OFF 6 2 4 2 Sensitivity setting relay switching point 6 2 5 Technical Data 7 3 Montage Cabling 8 3 1 System arrangement 8 3 2 Electrical connections 9 4 Installation...

Страница 2: ...the sensitivity is set appropriately the presence of the new objects is detected A potential free contact relay turns ON OFF according to the IN OUT movement of objects over the sensing area the swit...

Страница 3: ...Connections Con nector Pin Connection X1 1 24 VAC DC Supply Voltage Both polarity accepted 2 3 PE Reference Potential Connected to the earth X2 1 C Relay common contact 2 NO Relay normally open contac...

Страница 4: ...of the evaluation unit via the shield of the coaxial cable Montage structure C The design of the mounting structure depends on the conditions at the installation place It must be made of conductive ma...

Страница 5: ...switch on point occupied and the switch off point free for the relay The sensor signal level for the switch ON point is stronger than the switch OFF point A larger hysteresis means that the switch ON...

Страница 6: ...ves the reference value of the system The sensor electrodes must be free when performing a new adjustment No objects or person may be near the sensor electrodes SW2 2 OFF Memory OFF After power ON the...

Страница 7: ...n 2 5 Technical Data Parameter Sim Condition min tip max Unit Supply Voltage UV AC DC 18 24 30 V Operation Power IV 18V UV 30V 3 W Environment Tempera ture TF In operation 15 20 55 C TL Storage 20 60...

Страница 8: ...ts to be detected This ensures safe switching behavior The evaluation unit should be installed near the sensor electrodes The sensor line coaxial cable between the evaluation unit and sensor electrode...

Страница 9: ...e 5 Connect the reference potential of the evaluation unit X1 3 direct to the earthed mounting struc ture 6 Connect the supply voltage 24VAC DC to the evaluation unit X1 1 X1 2 7 First operation By th...

Страница 10: ...timum sensitivity for the working object is set LED2 confirms the process by flashing briefly 2 Manual Relay OFF LED5 OFF Rotate the switch SW1 clock wise until the relay switches ON plus three more p...

Отзывы: