4
3. Installation and Storage
3.1 Cautions for Installation and Storage
See Warning
(1)(2)(3)(5)(6)(7)(8)(9)(10)(11)(12)(13)(14), P04
See Caution (1)(2)(3), P05
See Note (1)(2) , P06
(7), P07
3.2 Environmental Conditions for Installation, Storage, and Operation
The fine clearances used in this pump require that the following conditions be satisfied during
storage, installation, and operation.
1. Ambient temperature of 0~40°C and maximum relative humidity of 85% during operation.
2. Other conditions (during storage and operation).
a) Level floor of sufficient strength.
b) No condensation
c) Dust-free environment
d) Well ventilated
e) Environment free of corrosive or explosive gas.
f
)
Not subject to direct sunlight.
g) No danger of fire.
h) Maximum ambient temperature of 40°C during assembly of pump.
3.3 Location
The pump should be installed level in a location with minimal dust and humidity. This location
should be selected in consideration of ease of installation and removal, inspection, and cleaning.
Particular attention should be paid to ambient temperature when fitting the pump to equipment.
Use anti-vibration rubbers to isolate the pump from vibrations in the equipment. See 3.2
Environmental Conditions for Installation, Storage, and Operation for details.
3.4 Checking Operation After Installation
1) Remove the rubber caps from the inlet and outlet.
2) Check that the pump switch is OFF (set to O), and insert the plug into the 100 V wall socket.
Note: Ensure that the power plug is sufficient for the rated voltage and current.
Note: Extension cords should be 3-wire, with lead wires having a cross-sectional area of at
least 0.75 mm
2
.
3)
Please intercept the power supply and connect it, except when the power strip is a plug.
4) Turn the switch ON (set to l) and check that gas is being drawn into the inlet.
5) When this check is complete, turn the power switch OFF (set to O) to stop the pump.
!
Warning
!
Caution
!
Note