ULB PROPRIETARY RIGHTS NOTICE
- This document contains the confidential and proprietary information of ULB. You may not
possess, use, copy or disclose this document or any information in it for any purpose without express written permission. Neither receipt
from any source, nor possession of this document, constitutes such permission. Possession, use, copying or disclosure by anyone
without express written permission of ULB is not authorized and may result in criminal and/or civil liability.
C:\Users\Service-Eng\Desktop\Mx\Manuals\ULB-R110 MANUAL_rev02.docx Page
35
of
42
Daily Maintenance Prior to Operation
1
. Inspect and remove any restrictions and/or obstructions to cold-air intake and hot-air
exhaust of the Load Bank unit.
2. Check screens to make sure objects have not blocked/entered openings.
3. Verify the direction of the airflow is in the proper direction from cold-air intake to hot-air
exhaust.
4. Verify that there is no possibility of re-circulation of hot-air exhaust to cold-air intake.
Quarterly Maintenance (every three months)
All electrical components, except Hand Held Unit (with HMI Display) are
mounted on Core Unit.
Figure-20 Fuse Replacement for Maintenance
Figure-21 Caster Tray