ULB PROPRIETARY RIGHTS NOTICE
- This document contains the confidential and proprietary information of ULB. You may not
possess, use, copy or disclose this document or any information in it for any purpose without express written permission. Neither receipt
from any source, nor possession of this document, constitutes such permission. Possession, use, copying or disclosure by anyone
without express written permission of ULB is not authorized and may result in criminal and/or civil liability.
C:\Users\Service-Eng\Desktop\Mx\Manuals\ULB-R110 MANUAL_rev02.docx Page
29
of
42
Note: Click <BACK> button to go back to SINGLE OR MULTIPLE load banks operation
choice screen.(see figure-15)
Figure-15 Master-Slave Operation
WARNING
Load bank should never be operated in Master-Slave mode if any of the COMM
(Communication) status indicator (on above screen) is ‘NOT OK”. Investigation must be
done to resolve communication problem.
1) Available Capacity: Total KW available from all the load banks in network. i.e for 5
x 110KW Load banks = 510KW. In the example screen available KW in each load
bank 83 KW at operating voltage.
2) Operator to enter following,
a. Set Load: Enter set KW from 0~ Available capacity i.e 5000KW,
b. Time duration in Hours and Min.
2) Click <LOAD APPLY> button will set KW in each load bank in network starting from
Master Load bank.
4) ACTUAL LOAD is the total KW load on all the load banks. ACT KW is the KW load
on individual load bank.