Figure 2: Minimum Installation Clearances To Combustible Materials
II. PRE-INSTALLATION
2. Boiler is suitable for installation on combustible
floor.
DO NOT
install boiler on carpeting.
3. For basement installation, provide a solid elevated
base, such as concrete, if floor is not level, or if
water may be encountered on floor around boiler.
4. Provide service clearance of at least 24” clearance
from front jacket panel for servicing burner and
annual cleaning.
5. For minimum clearances to combustible materials.
See Figure 2.
NOTICE
Clearance to venting is for single wall vent
pipe. If Type L vent is used, clearance may be
reduced to the minimum required by the vent pipe
manufacturer.
C
A
Above
B
Front
Chimney
Connector
D
Rear
E
Sides
N/A
24
18
6
6
N/A: Not applicable, radial chimney connector clearance eliminates any
possibility of combustible material above boiler.
NOTE 1: Listed clearances comply with American National
Standard NFPA 31, Standard for the Installation of Oil Burning
Equipment.
NOTE 2: LE® Series boilers can be installed in rooms with
clearances from combustible material as listed above. Listed
clearances cannot be reduced for alcove or closet installations.
NOTE 3: For reduced clearances to combustible material,
protection must be provided as described in the ANSI/NFPA 31
standard.
A.
INSPECT SHIPMENT carefully for any signs of
damage.
1. All equipment is carefully manufactured, inspected
and packed. Our responsibility ceases upon delivery
of crated boiler to the carrier in good condition.
2. Any claims for damage or shortage in shipment
must be filed immediately against the carrier by the
consignee. No claims for variances from, or
shortage in orders, will be allowed by the manufac-
turer unless presented within sixty (60) days after
receipt of goods.
B.
LOCATE BOILER near final position before removing
crate, see Figures 1A and 1B. Using hand truck or pipe
rollers under skid, move boiler into position along side
installation site.
1. Locate so that vent pipe connection to chimney will
be short and direct.
Содержание LE Series
Страница 5: ...5 103626 04 3 18 I GENERAL INFORMATION Figure 1A LE Packaged Water Boiler with Beckett AFG Burner...
Страница 46: ...46 103626 04 3 18 XIII REPAIR PARTS continued Figure 27 LE Bare Boiler Assembly...
Страница 48: ...48 103626 04 3 18 XIII REPAIR PARTS continued Figure 28 LE Boiler Jacket Insulation...
Страница 58: ...58 103626 04 3 18...
Страница 59: ...59 103626 04 3 18...
Страница 60: ...60 103626 04 3 18 U S Boiler Company Inc P O Box 3020 Lancaster PA 17604 1 888 432 8887 www usboiler net...