32
103626-04 - 3/18
VIII. SYSTEM START-UP (continued)
•
After third Recycle Mode trial, safety
switch locks out within safety switch
timing indicated on label and control
enters Restricted Mode. Ignition and
motor stop and oil valves closes.
d. Power Failure Check: After Flame is estab-
lished, turn the power off to the control/burner.
The burner should shut down safely. When
power is restored a normal ignition sequence
should be started.
WARNING
Cad Cell Jumper must be removed after this
check.
4. CHECK HIGH LIMIT
a. Adjust system thermostat(s) to highest setting.
b. Allow burner to run until boiler water tempera-
ture exceeds high limit setting. The burner
should shut down and circulators continue
running.
c. Allow the temperature to drop below control
setting. The burner must restart.
d. Boiler installation is not considered complete
until this check has been made.
5. CHECK LOW WATER CUT-OFF CONTROL, if
required on this boiler application. See Appendix
"A" at the rear of this manual for 'How to Test'.
6. CHECK OPERATING CONTROL on boiler
applications equipped with tankless heater(s). With
burner off, draw hot water until burner starts, then
turn off hot water and check burner shut-down.
J.
IF CONTROLS MEET REQUIREMENT
outlined in
Paragraph I.
1. Allow boiler to operate for approximately 30
minute, confirm the boiler and system have no leaks.
K.
IF CONTROLS DO NOT MEET REQUIREMENTS
outlined in Paragraphs I-1 thru I-6, replace control and
repeat checkout procedures.
Содержание LE Series
Страница 5: ...5 103626 04 3 18 I GENERAL INFORMATION Figure 1A LE Packaged Water Boiler with Beckett AFG Burner...
Страница 46: ...46 103626 04 3 18 XIII REPAIR PARTS continued Figure 27 LE Bare Boiler Assembly...
Страница 48: ...48 103626 04 3 18 XIII REPAIR PARTS continued Figure 28 LE Boiler Jacket Insulation...
Страница 58: ...58 103626 04 3 18...
Страница 59: ...59 103626 04 3 18...
Страница 60: ...60 103626 04 3 18 U S Boiler Company Inc P O Box 3020 Lancaster PA 17604 1 888 432 8887 www usboiler net...