background image

Door Swing Dimensions

5

6 Door Swing Dimensions

All units have a zero clearance for the door to open 90°. U-Line 
recommends a minimum door clearance of 2” to accommodate 
the handle if the unit is installed next to a wall. 

Other Site Requirements

Side-By-Side Installation

For a complete refreshment center, install two units side by side: 

Cut-out width for a side-by-side installation is the total of the 
widths listed under Cut-Out Dimensions in each unit’s Installation 
Guide. 

No trim kit is required. However, 1/4-inch space needs to be 
maintained between the units to ensure unobstructed door swing.

Units must operate from separate, properly grounded electrical 
receptacles placed according to each unit’s Electrical Specifications 
Requirements

Power Supply

The unit requires a grounded and polarized 115 VAC, 60 Hz, 15A 
circuit (normal household current). See Electrical Specifications

.

Water Supply

The unit requires a 1/4” O.D. soft copper supply line, or flexible 
water supply kit from U-Line (Part No. WATERHOOKUP). 

Drain

The CLR2160 & CLRCO2175 require access to either a gravity or 
pump fed drain. 

Environmental Requirements

The units are designed to operate between 50°F (10°C) and 100°F 
(37°C). High ambient temperatures (100°F [37°C] or higher) may 
reduce the unit’s ability to reach low temperatures and may also 
reduce the ice production rate for those models with ice makers.

If the ambient temperature is expected to drop below 45°F (7°C), 
drain all water from the unit to prevent freezing damage, which is 
not covered by the warranty.

For best performance, keep the unit out of direct sunlight and 
away from heat generating equipment.

For best performance and life outdoors, place under a counter or 
provide shelter of some kind.

In climates where high humidity and dew points are present, 
condensation may appear on outside surfaces. This is considered 
normal. The condensation will evaporate when the humidity drops.

1/4" Min.

Wall

21-3/4"

Wall

16-1/2"

21-3/4"

16-1/2"

2-1/8" Min.

90

Door Swing

90

Door Swing

Black and White

Stainless Steel

CLR2160

1/4" Min.

Wall

21-3/4"

Wall

21-3/4"

25-1/2"

25-1/2"

2-1/8" Min.

90

Door Swing

90

Door Swing

Black and White

Stainless Steel

CLRCO2160

1/4" Min.

Wall

90

Door Swing

20-7/8"

25-1/2"

Black

Wall

2" Min.

90

Door Swing

20-7/8"

25-1/4"

Stainless 

CO1175

1/4" Min.

Wall

Wall

2-1/8" Min.

90

Door Swing

Black and White

Stainless Steel

90

Door Swing

21-7/16"

25-1/2"

21-7/16"

25-1/2"

CO2175

1/4" Min.

90°

Door Swing

21-7/16"

22-3/8"

CO29

Содержание CLR2160

Страница 1: ...The Built In Undercounter Leader Since 1962 CLEAR ICE MODELS CLEAR ICE COMBO MODELS ICE COMBO MODELS U LINE COM CO1175 CO2175 CLR2160 CLRCO2175 INSTALL GUIDE CO29...

Страница 2: ...ment and Adjustment 6 Door Reversability 6 Reversing the door 6 Self Closing Doors Door Alignment and Adjustment 8 Door Reversability 8 Reversing the door 8 Door Panel Installation Custom 1 4 Thick Do...

Страница 3: ...cal Grounding Required Never attempt to repair or perform maintenance on the unit until the electricity has been disconnected Never remove the round grounding prong from the plug and never use a two p...

Страница 4: ...Panel Kit Part number U OL2175B black units U OL2175W white units A complete water hook up kit is also available for purchase from your dealer Order U Line Part No WATERHOOKUP Exterior Cleaning Black...

Страница 5: ...lations CLR2160 Series Follow the cut out drawing The 15 1 4 width allows 1 4 for ease in installation and removal of the unit 24 is the cabinet depth in most installations 8 24 Minimum 24 1 4 See Ele...

Страница 6: ...16 34 3 16 15 15 Black and White Stainless Steel 23 1 4 3 7 8 23 1 4 3 15 16 Add 3 4 To Depth For Drain Line Clearance Add 3 4 To Depth For Drain Line Clearance CO1175 Series BLACK CO1175 23 5 16 34...

Страница 7: ...ments The units are designed to operate between 50 F 10 C and 100 F 37 C High ambient temperatures 100 F 37 C or higher may reduce the unit s ability to reach low temperatures and may also reduce the...

Страница 8: ...h black and white doors are field reversible Stainless steel models with glass doors without locks are field reversible Stainless steel models without glass doors must be ordered right or left hand hi...

Страница 9: ...ure to only remove the two screws holding the actuator to the door Reinstall the actuator 4 on the opposite end of the door where the nameplate was removed 8 Install new nameplate where the actuator a...

Страница 10: ...sets 3 Turn the door upside down and inspect the hinge plate mounting holes The plate has slotted mounting holes Loosen but do not remove the two hinge plate screws 1 4 If door edge opposite the hinge...

Страница 11: ...r inserts as shown on the new bottom hinge 4 Remove existing bottom hinge Remove the existing bottom hinge three screws 2 Reinstall hinge to top opposite Install the hinge just removed from the bottom...

Страница 12: ...tilting forward and lifting off bottom hinge pin 2 Pull door gasket out of groove top edge of door only Start in the middle and pull outward moving toward the edge This may take some force Model Width...

Страница 13: ...een placed by a qualified electrician The unit requires a grounded and polarized 115 VAC 60 Hz 15A power supply normal household current An individual properly grounded branch circuit or circuit break...

Страница 14: ...n using the two wrenches Drain Connection CLR2160 CLRCO2175 IMPORTANT IMPORTANT Drain can NOT be located directly below unit Unit has a solid base that will not allow the unit to drain below itself We...

Страница 15: ...r cabinet or attempt to touch any components except the discharge tube during testing 4 Check that the clamps and hose connections are tight at the following areas Discharge tube A Drain tube B Vent t...

Страница 16: ...event of a pump failure It must have an operating temperature range of 50 F to 110 F 10 C to 40 C IMPORTANT IMPORTANT In the event of a power outage restricted drain or pump failure the failure to us...

Страница 17: ...st plugged into the electrical outlet Test the drain system by pouring one gallon of water into the ice bin The water should drain freely and there should be no leakage All Models 3 Gently push the un...

Страница 18: ...ution A The hinges should be self closing when the door is open approximately 8 If this is not the case make sure the closers at the bottom of the hinge pin are clean greased and installed correctly A...

Страница 19: ...today The Milwaukee Wisconsin based family operated business provides continuity and vision from which innovations continue to be born Going forward U Line will continue offering best in class product...

Отзывы: